My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 1 <br /> 2 Saw-cutting shall be performed in accordance with Sections 2-02.3(3). <br /> 3 <br /> 4 Measurement for saw-cutting will be per linear foot along the true length of the surface <br /> 5 cut. <br /> 6 <br /> 7 The unit price per linear foot for the final saw-cutting of asphalt concrete pavement, shall111 <br /> 8 be full pay for all labor, materials, tools, and equipment necessary to satisfactorily <br /> 9 complete the Work as specified in Section 2-02.3(3) of the Standard Specifications and <br /> 10 disposal of cuttings slurry, including vacuum collection. <br /> 11 <br /> 12 All labor, materials, tools and equipment necessary to disposal of cuttings slurry, including <br /> 13 vacuum collection, shall be included in the Contract Unit Price. <br /> 14 <br /> 15 <br /> 16 IC 2-02.3(6),RTF , <br /> 17 (******) <br /> 18 <br /> 19 2-02.3(6) Sawing and Line Drilling <br /> 20 <br /> 21 Curb shall be saw cut full height and width. <br /> 22 <br /> 23 Asphalt shall be saw cut full depth. <br /> 24 <br /> 25 When line drilling, spacing of drilled holes center to center shall be 6 inches <br /> 26 maximum. Holes shall be perpendicular to the surface and shall penetrate <br /> 27 completely through the pavement. <br /> 28 <br /> 29 When the drawings indicate or the Engineer requires sawcutting pavement <br /> 30 which comprises of rigid base and asphalt overlay, the minimum saw cut-depth <br /> 31 for the rigid base shall be full depth. <br /> 32 <br /> 33 For rigid base constructed with mortared decorative or special pavement (e.g., <br /> 34 brick, cobblestone, paver block, etc.) or any combination of such materials the <br /> 35 depth shall be full thickness of the rigid base along a neat line with intent to <br /> 36 salvage as many special pavement units as possible. <br /> 3738 <br /> 39f , <br /> 40 END DIVISION 2 <br /> 41 ' <br /> I <br /> i <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 70 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.