My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Removal shall be extended to a through joint or to the edge of the sidewalk if within <br /> 2 4 feet of a neat line. <br /> ' 3 The minimum width of new or remaining concrete walk shall be as follows: <br /> 4 <br /> 5 Two feet when sidewalk is or will be supported on each side by properly placed <br /> ' 6 <br /> 7 concrete walk or other improvement that will prevent the sidewalk from shifting. <br /> Four feet when sidewalk is or will be bounded by earth planting strip. <br /> 8 <br /> ' 9 The depth of saw cut shall be a minimum of 2 inches. Saw cuts shall leave straight <br /> 10 edges and vertical faces. No diagonal cuts in sidewalk will be allowed unless <br /> 11 otherwise indicated on the drawings or directed by the Engineer. <br /> 12 <br /> 13 A concrete walk that is to remain in place will be protected from equipment damage <br /> 14 by using planking or with rock free 8-inch blanket of excavated soil. <br /> 15 <br /> ' 16 Where sidewalk adjacent to a sidewalk opening is in poor condition, removal shall <br /> 17 be extended to the nearest through joint or scribe mark as may be directed by the <br /> 18 Engineer. <br /> ' 19 <br /> 20 Pavement breakers shall be approved by the Engineer before use. <br /> 21 <br /> ' 22 <br /> 23 .2-92r4FGR-2 <br /> 24 Measurement <br /> 25 <br /> ' 26 9_02.4 NST1.CR2 <br /> 27 --_ •_• e .- - __ •.-. -_ .. • the following: <br /> 28 <br /> ' 29 2 02.4,OPT2.GR2 <br /> 30 {September 8, 1997) <br /> 31 Pavement removal will be measured by the square yard. <br /> ' 32 <br /> 33 2 02,4,OPT3,GR2 <br /> 34 {October 25, 1999} <br /> 35 Sidewalk removal will be measured by the square yard. <br /> 36 <br /> 37 2 02,4.OPT4.GR2 <br /> 38 {September 8, 1997} <br /> ' 39 Curb removal will be measured by the linear foot. <br /> 40 <br /> 41 2-02.5.GR2 <br /> ' 42 Payment <br /> 43 <br /> 44 2-02 S.INSTLGR2 <br /> ' 45 Section 2-02.5 is revised by the following: <br /> 46 <br /> 47 2-02.5 sawcut.docx <br /> ' 48 (******) <br /> 49 <br /> 50 "Sawcut", per linear foot. <br /> N.BROADWAY TRANSIT IMPROVEMENT PROJECT Addendum#1 <br /> STATE FUND#GCB2316; COE WO#3644 69 August 16,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.