Laserfiche WebLink
1 <br /> 2 <br /> 3 DIVISIQN4.GR4 <br /> ' 4 Division 4 <br /> 5 Bases <br /> 6 <br /> 7 PsKK 4-04.1 CSTS.RTF <br /> 8 4-04.3 Construction Requirements <br /> 9 <br /> ' 10 Section 4-04.3 is supplemented with the following: <br /> 11 <br /> 12 (******) <br /> 13 <br /> 14 Where shown in the Plans, or as directed by the Engineer, the Contractor shall place, <br /> 15 smooth, and compact Crushed Surfacing Top Course (CSTC). CSTC can also be used <br /> 16 as driveway maintenance, and in gravel driveway restoration to a minimum of 3" depth. <br /> 17 <br /> ' 18 <br /> 19 <br /> 20 END DIVISION4.RTF <br /> 21 END DIVISION 4 <br /> 22 <br /> I <br /> I <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 71 August 8, 2018 <br />