My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • <br /> 1 No payment will be made for the rejected materials or the removal of the materials <br /> 2 unless the Contractor requests that the rejected material be tested. If the Contractor <br /> 3 elects to have the rejected material tested, a minimum of three representative samples <br /> 4 will be obtained and tested. Acceptance of rejected material will be based on <br /> 5 conformance with the nonstatistical acceptance Specification. If the CPF for the rejected <br /> 6 material is less than 0.75, no payment will be made for the rejected material; in addition, <br /> I <br /> 7 the cost of sampling and testing shall be borne by the Contractor. If the CPF is greater <br /> 8 than or equal to 0.75, the cost of sampling and testing will be borne by the Contracting <br /> 9 Agency. If the material is rejected before placement and the CPF is greater than or equal <br /> 10 to 0.75, compensation for the rejected material will be at a CPF of 0.75. If rejection <br /> 11 occurs after placement and the CPF is greater than or equal to 0.75, compensation for <br /> 12 the rejected material will be at the calculated CPF with an addition of 25 percent of the <br /> 13 unit Contract price added for the cost of removal and disposal. <br /> 14 <br /> 15 5-04.3(11)D Rejection - A Partial Sublot <br /> 16 In addition to the random acceptance sampling and testing, the Engineer may also <br /> 17 isolate from a normal sublot any material that is suspected of being defective in relative <br /> 18 density, gradation or asphalt binder content. Such isolated material will not include an <br /> 19 original sample location. A minimum of three random samples of the suspect material <br /> 20 will be obtained and tested. The material will then be statistically evaluated as an <br /> 21 independent lot in accordance with Section 1-06.2(2). <br /> I 22 <br /> 23 5-04.3(11)E Rejection - An Entire Sublot <br /> 24 An entire sublot that is suspected of being defective may be rejected. When a sublot is <br /> 25 rejected a minimum of two additional random samples from this sublot will be obtained. <br /> 26 These additional samples and the original sublot will be evaluated as an independent lot <br /> 27 in accordance with Section 1-06.2(2). <br /> I28 <br /> 29 5-04.3(11)F Rejection -A Lot in Progress <br /> 30 The Contractor shall shut down operations and shall not resume HMA placement until <br /> 31 such time as the Engineer is satisfied that material conforming to the Specifications can <br /> 32 be produced: <br /> I 33 <br /> 34 1. When the Composite Pay Factor (CPF) of a lot in progress drops below 1.00 and <br /> 35 the Contractor is taking no corrective action, or <br /> 36 2. When the Pay Factor (PF) for any constituent of a lot in progress drops below <br /> 37 0.95 and the Contractor is taking no corrective action, or <br /> 38 3. When either the PFi for any constituent or the CPF of a lot in progress is less <br /> 39 than 0.75. <br /> 40 <br /> 41 5-04.3(11)G Rejection - An Entire Lot (Mixture or Compaction) <br /> 42 An entire lot with a CPF of less than 0.75 will be rejected. <br /> 43 <br /> 44 5-04.3(12) Joints <br /> 45 <br /> 46 5-04.3(12)A HMA Joints <br /> I <br /> I N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 91 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.