Laserfiche WebLink
I <br /> 1 1 <br /> 2 5-04.3(12)A1 Transverse Joints <br /> 3 The Contractor shall conduct operations such that the placing of the top or wearing I <br /> 4 course is a continuous operation or as close to continuous as possible. Unscheduled <br /> 5 transverse joints will be allowed and the roller may pass over the unprotected end of the <br /> 6 freshly laid mixture only when the placement of the course must be discontinued for <br /> I <br /> 7 such a length of time that the mixture will cool below compaction temperature. When the <br /> 8 Work is resumed, the previously compacted mixture shall be cut back to produce a <br /> 9 slightly beveled edge for the full thickness of the course. <br /> 10 <br /> 11 A temporary wedge of HMA constructed on a 20H:1V shall be constructed where a <br /> 12 transverse joint as a result of paving or planing is open to traffic. The HMA in the <br /> 13 temporary wedge shall be separated from the permanent HMA by strips of heavy <br /> 14 wrapping paper or other methods approved by the Engineer. The wrapping paper shall <br /> 15 be removed and the joint trimmed to a slightly beveled edge for the full thickness of the <br /> I <br /> 16 course prior to resumption of paving. <br /> 17 <br /> 18 The material that is cut away shall be wasted and new mix shall be laid against the cut. I <br /> 19 Rollers or tamping irons shall be used to seal the joint. <br /> 20 <br /> 21 5-04.3(12)A2 Longitudinal Joints I <br /> 22 The longitudinal joint in any one course shall be offset from the course immediately <br /> 23 below by not more than 6 inches nor less than 2 inches. All longitudinal joints <br /> 24 constructed in the wearing course shall be located at a lane line or an edge line of the <br /> 25 Traveled Way. A notched wedge joint shall be constructed along all longitudinal joints in <br /> 26 the wearing surface of new HMA unless otherwise approved by the Engineer. The <br /> 27 notched wedge joint shall have a vertical edge of not less than the maximum aggregate <br /> 28 size or more than 1/2 of the compacted lift thickness and then taper down on a slope not <br /> 29 steeper than 4H:1V. The sloped portion of the HMA notched wedge joint shall be <br /> 30 uniformly compacted. I <br /> 31 <br /> 32 5-04.3(12)B Bridge Paving Joint Seals <br /> 33 <br /> I <br /> 34 5-04.3(12)61 HMA Sawcut and Seal <br /> 35 Prior to placing HMA on the bridge deck, establish sawcut alignment points at both ends <br /> 36 of the bridge paving joint seals to be placed at the bridge ends, and at interior joints <br /> 37 within the bridge deck when and where shown in the Plans. Establish the sawcut <br /> 38 alignment points in a manner that they remain functional for use in aligning the sawcut <br /> I <br /> 39 after placing the overlay. <br /> 40 <br /> 41 Submit a Type 1 Working Drawing consisting of the sealant manufacturer's application <br /> III <br /> 42 procedure. <br /> 43 <br /> 44 Construct the bridge paving joint seal as specified ion the Plans and in accordance with <br /> I <br /> 45 the detail shown in the Standard Plans. Construct the sawcut in accordance with the <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> I <br /> STATE FUND#GCB2316; COE WO#3644 92 August 8, 2018 <br />