Laserfiche WebLink
1 Where shown in the plans, existing valve boxes and covers shall be adjusted to the grade as <br /> 2 staked or otherwise designated by the Engineer <br /> 3 <br /> 4 All respective valve(s) shall be fully operational after adjustment. <br /> 5 <br /> ' 6 7-20A Measurement <br /> 7 <br /> 8 No measurement shall be made for removal of existing meter box, and lid, excavation, or <br /> 9 backfilling. <br /> 10 <br /> 11 7-20.5 Payment <br /> 12 "Adjust Water Meter Box to Grade", per EACH. <br /> 13 <br /> 14 The unit contract price per each for "Adjust Water Meter Box to Grade" shall be full pay for all <br /> 15 costs necessary to make the adjustment including excavation, haul off, compaction during <br /> 16 restoration with crushed rock, and restoration of adjacent disturbed areas. <br /> 17 <br /> 18 <br /> 19 END DIVI5ION7,RTF <br /> 20 <br /> 21 END DIVISION 7 <br /> 22 <br /> 1 <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> ' N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 113 August 8, 2018 <br />