My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 valve box complete, including trenching, backfilling, hydrostatic testing, and disinfecting. <br /> 2 Unit price will not include tapping existing water main or installation of tapping sleeve and <br /> 3 valve, which shall be done by City personnel. Concrete blocking and pavement patching <br /> 4 will be paid for separately. <br /> 5 <br /> 6 "Remove and Salvage ValveNalve Box and Cap at Main", per EACH. <br /> 7 <br /> 8 The unit contract price per each for "Remove and Salvage ValveNalve Box and Cap <br /> 9 at Main" shall be full pay for all labor, materials and equipment necessary in removing <br /> 10 and salvaging the valve and valve box and installing the cap at main including excavation, <br /> 11 backfill and restoration to grade. <br /> 12 <br /> 13 "Remove Existing Valve Box", per EACH. <br /> 14 <br /> 15 The unit contract price per each for "Remove Existing Valve Box" shall be full pay for <br /> 16 all labor, materials and equipment necessary in removing the valve box including <br /> 17 excavation, backfill and restoration of adjacent areas. <br /> 18 <br /> 19 "Adjust Valve Box to Grade", per EACH. <br /> 20 "Adjust Service Box to Grade", per EACH. <br /> 21 <br /> 22 The unit contract price per each for "Adjust Valve Box to Grade" and "Adjust Service <br /> 23 Box to Grade" shall be full pay for all costs necessary to make the adjustment including <br /> 24 excavation (approximately 2' square), haul off, compaction during restoration with <br /> 25 crushed rock, and restoration of adjacent disturbed areas. <br /> 26 <br /> 27 <br /> 28 COE 7-20 DJUS WATER METER BOX,RTi- <br /> 29 7-20 WATER METER BOX <br /> 30 (******) <br /> 31 1 <br /> 32 Section 7-20 is new and is supplemented with the following: <br /> 33 <br /> 34 7-20.1 Description <br /> 35 <br /> 36 This Work consists of replacing water meter box in accordance with the Construction Plans, <br /> 37 City of Everett Standard Drawings 501, & 502 and the Standard Specifications. The new <br /> 38 water meter box shall be adjusted to the grade as staked or otherwise designated by the <br /> 39 ENGINEER. <br /> 401 <br /> 41 7-20.2 Materials <br /> 42 <br /> 43 Materials shall meet the requirements as specified in the COE Standard Drawings #501 & <br /> 44 502. <br /> 45 <br /> 46 7-20.3 Construction Requirements <br /> 47 <br /> 1 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 112 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.