My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 Forms for the straight sections of the driveway shall have a minimum thickness of 3" and be <br /> 2 equal to the nominal depth of the concrete. Plywood or 1" lumber may be used on radii. All <br /> 3 forms shall be securely staked and blocked to true line and grade. <br /> 4 <br /> 5 The driveway shall be protected against damage or defacement of any kind until acceptance <br /> 6 by Owner. Any driveway not acceptable, in the opinion of the Engineer, because of damage <br /> 7 or defacement shall be removed and shall be replaced by the Contractor at his expense. <br /> 8 <br /> 9 Before placing any concrete, the Contractor shall have on the job site enough protective paper, <br /> 10 or equivalent, to cover the pour of an entire day in the event of rain or other unsuitable weather <br /> 11 conditions. <br /> 12 <br /> 13 Curing of approach concrete shall be in accordance with Section 5-05.3(13). <br /> 14 <br /> 15 Concrete approaches may be opened to traffic in accordance with Section 5-05.3(18). <br /> 16 <br /> 17 8-06.4 Measurement <br /> 18 <br /> 19 Section 8-06.4 shall be supplemented with the following: <br /> 20 <br /> 21 Removal of existing driveway entrance, and preparing the sub-base shall be paid under <br /> 22 contract unit price of"Roadway Excavation Incl. Haul." <br /> 23 <br /> 24 The placing of the CSTC under the new Cement Conc. Driveway Ramp shall be paid for in <br /> 25 accordance to Section 4-04. <br /> 26 <br /> 27 8-06.5 Payment <br /> 28 <br /> 29 Section 8-06.5 is supplemented with the following: <br /> 30 <br /> 31 "Cement Concrete Driveway Ramp Type ", per Square Yard. <br /> 32 ,33 <br /> 34 P-s .GAZ <br /> 35 Cement Concrete Sidewalks <br /> 36 <br /> 37 8-14, ,GRS <br /> 38 Description <br /> 39 <br /> 40 CO' 8-14 5DWIC far CURS RAMiP,RTF <br /> 41 8-14 CEMENT CONCRETE SIDEWALKS <br /> 42 8-14.3 Construction Requirements <br /> 43 <br /> 44 Section 8-14.3 shall be deleted and replaced with the following: <br /> 45 <br /> 46 (******) <br /> 47 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 118 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.