My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 The concrete in the Cement Concrete Sidewalk shall be Commercial Mix in accordance <br /> 2 with the requirements of Section 6-02, and as defined in the City of COE Standard <br /> 3 Drawing No. 312. <br /> I4 <br /> 5 8-14,3(1)Excavation <br /> 6 <br /> I 7 Section 8-14.3 (1) is supplemented with the following: <br /> 8 <br /> 10 It is expected there will be sufficient suitable native material excavated from various <br /> 11 portions of the improvement to fill low areas in the sidewalk subgrade and planting <br /> I 12 strip area when needed and no further payment will be allowed for fill material. <br /> 13 Where there is insufficient suitable native material on the project site, the <br /> 14 Contractor shall furnish, place and compact CSTC meeting the requirements of <br /> I15 Section 4-04 of these Specifications. <br /> 16 <br /> 17 <br /> I <br /> 18 8-14.3(6)Curb Ramp 1 <br /> 19 <br /> 20 Section 8-14.3 (6) is new and is supplemented with the following: <br /> 21 (******) <br /> 22 Curb ramp locations will be designated on the drawings or marked in the field by <br /> ' 23 <br /> 24 the Engineer. Where curb ramps are to be constructed, the Contractor shall <br /> construct curb ramp in accordance to the City of Everett Standard Drawing #318, <br /> 25 319, 320, 321, or WSDOT Standard Drawings F-40.12-02, F-40.14-02, F-40.15-02, <br /> I 26 F-40.16-02, F-45.10-01. <br /> 27 <br /> 28 Curb ramps shall be constructed separately from the sidewalk to produce a definite <br /> 29 break line between the ramp and the sidewalk. A 3/8 inch non-extruded through <br /> I <br /> 30 joint material shall be installed between the curb and the sidewalk with edging as <br /> 31 specified in Section 8-14.3(3). <br /> 32 <br /> 1 <br /> 33 8-14.4 Measurement <br /> 34 <br /> 35 Section 8-14.4 is supplemented with the following: <br /> 36 <br /> 37 (******) <br /> I 38 <br /> 39 "Modified Type Curb Ramp" per Each. <br /> 40 "Modified Half Flare Type Curb Ramp", per Each. <br /> I 41 "Median Cut-Through", per Each. <br /> 42 "Type Curb Ramp", per Each. <br /> 43 Bid Items listed above does not include the adjacent Curb, Curb and Gutter, Pedestrian <br /> I44 Curb or Sidewalks. <br /> I <br /> BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> IN. <br /> STATE FUND#GCB2316; COE WO#3644 119 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.