My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 1 <br /> 2 8-14.5 Payment <br /> 3 <br /> 4 Section 8-14.5 is supplemented with the following: <br /> 5 <br /> 6 (******) 111 <br /> 7 <br /> 8 "Modified Type Curb Ramp", per Each. <br /> 9 "Modified Half Flare Type Curb Ramp", per Each. <br /> 10 "Median Cut-Through", per Each. <br /> 11 "Type _ Curb Ramp", per Each. <br /> 12 <br /> 13 Above Bid Items do not include the adjacent Curb, Curb and Gutter, Pedestrian Curb or <br /> 14 Sidewalks. <br /> 15 <br /> 16 Any sidewalk not acceptable in the opinion of the Engineer, because of damage, <br /> 17 defacement, or carelessness on the part of the Contractor shall be removed, replaced <br /> 18 and paid for in accordance to Section 1-05.7 (Removal of Defective and Unauthorized <br /> 19 Work) of these provisions. <br /> 20 <br /> 21 The placement of the CSTC under the new Cement Conc. Sidewalk shall be measured <br /> 22 and paid in accordance to Section 4-04. <br /> 23 <br /> 24 8-14.I.TNSTI.GR8 <br /> 25 Section 8-14.1 is revised to read: <br /> 26 <br /> 27 8-14.I.QPTL GR8 <br /> 28 (April 3, 2017) ' <br /> 29 This Work consists of constructing cement concrete sidewalks, curb ramps, bus stop <br /> 30 shelter foundations, masonry sidewalks, and ramp grinding in accordance with details <br /> 31 shown in the Plans, Standard Plans, these Specifications, and in conformity to the lines <br /> 32 and grades shown in the Plans, Standard Plans, and as established by the Engineer. <br /> 33 <br /> 34 8-14.3,GR8 <br /> 35 Construction Requirements <br /> 36 <br /> 37 8-14.3.INSTI.GR8 <br /> 38 Section 8-14.3 is supplemented with the following: <br /> 39 <br /> 40 8-14.3.0PTI,GR8 <br /> 41 (April 3, 2017) , <br /> 42 The Contractor shall request a pre-construction meeting with the Engineer to be held two <br /> 43 to five working days before any work can start on cement concrete sidewalks, curb ramps <br /> 44 or other pedestrian access routes to discuss construction requirements. Those attending <br /> 45 shall include: <br /> 46 <br /> 47 1. The Contractor and Subcontractor in charge of constructing forms, and placing, <br /> 48 and finishing the cement concrete. <br /> 49 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 120 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.