My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 important element to the safe operation of any natural gas distribution system. Per the <br /> 2 pipeline safety regulations contained in WAC 480-93, valves must be maintained during <br /> 3 construction, and the corrosion protection for steel gas piping must be periodically <br /> 1 4 monitored. <br /> 5 <br /> 6 It is essential to coordinate the raising of valve boxes and cathodic protection test lead <br /> 1 7 boxes that are within the Project Limits. <br /> 8 <br /> 9 8-30.2 Vacant <br /> I 10 <br /> 11 <br /> 12 8-30.3 Construction Requirements <br /> I 13 <br /> 14 Contractor shall coordinate with PSE, and notify City's Inspector when adjustment is <br /> 15 deemed necessary, or as noted on Plans. PSE has the option of hiring another contractor <br /> I 16 or negotiating and contracting work directly with Contractor selected by the City. <br /> 17 <br /> 18 "IT'S THE LAW" Call 2 Business Days Before You Dig 1-800-424-555, 811 or <br /> 19 www.callbeforeyoudiq.com <br /> I 20 <br /> 21 <br /> I 22 8-30.4 Vacant <br /> 23 <br /> 24 <br /> I 25 8-30.5 Payment <br /> 26 <br /> 27 No separate payment will be made for maintaining access to valves during construction. <br /> I 28 Cost associated with such work shall be included in the unit contract prices of various <br /> 29 related Bid Items. <br /> 30 <br /> 31 GKK 3-32 RESOLVED UNDERGROUND CONFLICT R T F <br /> I32 (******) <br /> 33 <br /> 1 34 8-32 RESOLVED UNANTICIPATED CONFLICTS <br /> 35 Section 8-32 is new with the following: <br /> I 36 <br /> 37 8-32.1 Description <br /> 38 <br /> I <br /> 39 This work consists of resolving unanticipated conflicts to conform to the Project <br /> 40 requirements due to construction, where they are not addressed by the Construction <br /> 41 Plans and Details. These bid items might also be used to construct or modify items <br /> I 42 which are not identified, nor addressed in the Plans and Details. <br /> 43 <br /> 44 8-32.2 Vacant <br /> I 45 <br /> 46 8-32.3 Construction Requirements <br /> 47 <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 139 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.