Laserfiche WebLink
I <br /> 1 Ground space are 32 %a" diameter x 38 %" with door open to remove 40" liner. Leg I <br /> 2 height shall be 6". <br /> 3 <br /> 4 <br /> 5 8-30.3(11) Inground Transit Square Post & Sign <br /> 6 <br /> 7 Construct post foundation and use square post & sleeve per COE Standard Dwg # <br /> 8 715 & #716. <br /> 9 <br /> 10 8-30.4 Measurement <br /> 11 <br /> 12 Measurement for each "Transit Shelter Amenities" shall include the construction, <br /> 13 furnishing, and installation of all the following items at each location as identified in <br /> 14 Construction Plans: <br /> 15 • one Concrete Transit Pad (including welded wire fabric), <br /> 16 • one ADA pad, I <br /> 17 • one shelter, <br /> 18 • one bench, <br /> 19 • one bike rack, I <br /> 20 • one Transit Stop post with foundation, and sign; and <br /> 21 • one receptacle. <br /> 22 <br /> 23 8-30.5 Payment <br /> 24 <br /> 25 Payment will be made in accordance with Section 1-04.1 for each of the following <br /> 26 bid items that are included in the Proposal: <br /> 27 <br /> 28 "Transit Shelter Amenities," per each <br /> 29 <br /> 30 The unit contract price per each for "Transit Shelter" shall include the complete <br /> 31 furnishing, construction and installation of all items listed in Section 8-30-4 of these <br /> 32 provisions. All other materials, tools, equipment, and labor necessary to complete <br /> 33 the work as specified, shall be included in the Contract Bid Price. <br /> 34 <br /> 35 CSTC, shall be paid in accordance to Section 4-04. <br /> 36 <br /> 37 <br /> 38 Safi _*,/7. .57 !'T T <br /> 39 (******) <br /> 40 ' <br /> 41 8-30 ADJUST EXISTING GAS VALVE FRAME AND LID <br /> 42 Section 8-30 is new and is supplemented with the following: I <br /> 43 <br /> 44 8-30.1 Description <br /> 45 <br /> 46 Puget Sound Energy recognizes the necessities of adjusting natural gas valve and <br /> 47 cathodic protection test lead boxes during project improvements. Access to valves is an <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 138 August 8, 2018 <br />