My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • <br /> 1 1 1-09.2(2) Specific Requirements for Batching Scales <br /> 2 The last sentence of the first paragraph is revised to read: <br /> ' 3 <br /> 4 Batching scales used for concrete or hot mix asphalt shall not be used for batching <br /> 5 other materials. <br /> 6 <br /> 7 1-09.10 Payment for Surplus Processed Materials <br /> 8 The following sentence is inserted after the first sentence of the second paragraph: <br /> 9 <br /> 10 For Hot Mix Asphalt, the Plan quantity and quantity used will be adjusted for the quantity <br /> 11 of Asphalt and quantity of RAP or other materials incorporated into the mix. <br /> 12 <br /> 13 2-02.AP2 <br /> 14 Section 2-02, Removal of Structures and Obstructions <br /> 15 April 2, 2018 <br /> 16 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> 17 In item number 3 of the first paragraph, the second sentence is revised to read: <br /> I 18 <br /> 19 For concrete pavement removal, a second vertical full depth relief saw cut offset 12 to 18 <br /> 20 inches from and parallel to the initial saw cut is also required, unless the Engineer allows <br /> ' 21 <br /> 22 otherwise. <br /> 23 2-09.AP2 <br /> 24 Section 2-09, Structure Excavation <br /> 25 April 2, 2018 <br /> 26 2-09.2 Materials <br /> 27 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 28 Cement Concrete" are revised to read: <br /> 29 <br /> 30 Cement 9-01 <br /> 31 Fine Aggregate for Concrete 9-03.1(2) <br /> 32 <br /> 33 2-09.3(3)D Shoring and Cofferdams <br /> 34 The first sentence of the sixth paragraph is revised to read: <br /> 35 <br /> 36 Structural shoring and cofferdams shall be designed for conditions stated in this Section <br /> 37 using methods shown in Division I Section 5 of the AASHTO Standard Specifications for <br /> 38 Highway Bridges Seventeenth Edition—2002 for allowable stress design, or the AASHTO <br /> 39 LRFD Bridge Design Specifications for load and resistance factor design. <br /> 40 <br /> 41 3-01.AP3 <br /> 42 Section 3-01, Production from Quarry and Pit Sites <br /> 43 April 2, 2018 <br /> 44 3-01.1 Description <br /> 45 The first paragraph is revised to read: <br /> 46 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.