My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> NOTES <br /> TYPE 2W 1. REFERENCES SEE STANDARD DRAWING 722 <br /> (WHITE,ONE SIDE,ARTERIAL STREETS ONLY) 2. MATERIAL THICKNESS SHALL BE PER STANDARD <br /> SPECIFICATIONS 8-22. <br /> I I MG <br /> "==== 3. UNLESS CALLED FOR IN THE PLANS,RAISED <br /> 10' 10' I PAVEMENT INSTALLED ON ARTERIAL STREETS.SHALL ONLY BE <br /> - j <br /> STRIPE 30'GAP STRIPE yil <br /> 40' <br /> LANE WIDTH <br /> MEASUREMENT POINT <br /> LANE LINE (WHITE) <br /> TYPE 2YY <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) VEHICLE LANE WIDTH <br /> -r <br /> - 4 <br /> MEASUREMENT POINT WHEN <br /> USED AS BICYCLE STRIPE <br /> ( <br /> II N I sF _ <br /> 10' 10' LANE WIDTH MEASUREMENT <br /> STRIPE 30'GAP STRIPE POINT WHEN USED AS GORE OR <br /> 40' EDGE LINE <br /> LANE WIDTH <br /> MEASUREMENT POINT GORE,X=8"; EDGE,W=4"; BICYCLE,W=8" <br /> TWO WAY LEFT TURN LANE LINE (YELLOW) WIDE,EDGE AND BICYCLE LINE (WHITE) <br /> TYPE 2YY <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY)N <br /> N <br /> K I I <br /> 10' 10' <br /> STRIPE 30'GAP STRIPE 11 <br /> TYPE 2YY 40' <br /> - <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) SKIP CENTER LINE (YELLOW) <br /> LANE WIDTH <br /> I I MEASUREMENT POINT <br /> III I — I f <br /> CITY OF EVERETT <br /> z [ 40 LANE WIDTH <br /> PUBLIC WORKS DEPARTMENT <br /> MEASUREMENT POINT DOUBLE YELLOW CENTER LINE <br /> 'IrAk SASS ICORi I AVuw a."SH <br /> 123"0/2 <br /> 016p�ay <br /> i ROADWAY STRIPING DETAILS 720 <br /> I.' <br /> I I <br /> M — — UM — MI E - MB - M E 111111 - N NM EN - N <br />
The URL can be used to link to this page
Your browser does not support the video tag.