My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 5-04.5 Payment <br /> 3 The paragraph following the Bid item "Crack Sealing-LF", per linear foot is revised to read: <br /> 4 <br /> 5 The unit Contract price per linear foot for "Crack Sealing-LF" shall be full payment for all <br /> 6 costs incurred to perform the Work described in Section 5-04.3(4)A. <br /> 7 <br /> 8 5-05.AP5 <br /> 9 Section 5-05, Cement Concrete Pavement <br /> 10 August 6, 2018 <br /> 11 5-05.1 Description <br /> 12 In the first paragraph, "portland cement concrete" is revised to read "cement concrete". <br /> 13 <br /> 14 5-05.2 Materials 11115 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 16 <br /> 17 Cement 9-01 <br /> 18 <br /> 19 In the first paragraph, the section reference for Concrete Patching Material is revised to read <br /> 20 "9-20.1". <br /> 21 <br /> 22 5-05.3(1) Concrete Mix Design for Paving <br /> 23 The table title in item number 4 is revised to read Concrete Batch Weights. <br /> 24 <br /> 25 In item 4a, "Portland Cement" is revised to read "Cement". <br /> 26 <br /> 27 5-05.3(4) Measuring and Batching Materials <br /> 28 Item number 2 is revised to read: <br /> 29 <br /> 30 2. Batching Materials — On all projects requiring more than 2,500 cubic yards of <br /> 31 concrete for paving, the batching plant shall be equipped to proportion aggregates <br /> 32 and cement by weight by means of automatic and interlocked proportioning devices <br /> 33 of accepted type. <br /> 34 <br /> 35 5-05.3(4)A Acceptance of Portland Cement Concrete Pavement <br /> 36 <br /> 37 This section's title is revised to read: <br /> 38 <br /> 39 Acceptance of Portland Cement or Blended Hydraulic Cement Concrete <br /> 40 Pavement I <br /> 41 <br /> 42 The first sentence is revised to read: <br /> 43 <br /> 44 Acceptance of portland cement or blended hydraulic cement concrete pavement shall be <br /> 45 as provided under statistical or nonstatistical acceptance. <br /> 46 <br /> 47 5-05.4 Measurement <br /> 48 The last paragraph is revised to read: <br /> 49 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.