My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' 1 depth of the cut shall be a minimum of 3/4 inch, but shall be reduced if <br /> 2 necessary to avoid damaging any reinforcement. For repairs on <br /> I <br /> 3 vertical surfaces, the top edge shall slope up toward the front at a 1- <br /> 4 vertical-to-3-horizontal slope. <br /> 5 <br /> I <br /> 6 <br /> 7 3. Remove concrete within the repair area to a depth at least matching <br /> the cut depth at the edges. Large variations in the depth of removal <br /> 8 within short distances shall be avoided. Roughen the concrete surface. <br /> I9 The concrete surface should be roughened to at least Concrete <br /> 10 Surface Profile (CSP) 5 in accordance with ICRI Guideline No. 310.2R, <br /> 11 unless a different CSP is recommended by the patching material <br /> 12 manufacturer. <br /> ' 13 <br /> 14 4. Inspect the concrete repair surface for delaminations, debonding, <br /> 15 microcracking and voids using hammer tapping or a chain drag. <br /> I 16 Remove any additional loose or unsound concrete in accordance with <br /> 17 steps 1 through 3. <br /> 18 <br /> ' 19 5. Select a patching material in accordance with Section 9-20.2 that is <br /> 20 appropriate for the repair location and thickness. The concrete <br /> 21 patching material shall be pumpable or self-consolidating as required <br /> I 22 for the type of placement that suits the repair. The patching material <br /> 23 shall have a minimum compressive strength at least equal to the <br /> 24 specified compressive strength of the concrete. <br /> 25 <br /> I26 6. Prepare the concrete surface and reinforcing steel in accordance with <br /> 27 the patching material manufacturer's recommendations.At a minimum, <br /> 28 clean the concrete surfaces (including perimeter edges) and <br /> I <br /> 29 reinforcing steel using oil-free abrasive blasting or high-pressure <br /> 30 (minimum 5,000 psi) water blasting. All dirt, dust, loose particles, rust, <br /> 31 laitance, oil, film, microcracked/bruised concrete or foreign material of <br /> I 32 any sort shall be removed. Damage to the epoxy coating on steel <br /> 33 reinforcing bars shall be repaired in accordance with Section 6- <br /> 34 02.3(24)H. <br /> I <br /> 35 <br /> 36 7. Construct forms if necessary, such as for patching vertical or overhead <br /> 37 surfaces or where patching extends to the edge or corner of a <br /> I 38 placement. <br /> 39 <br /> 40 8. When recommended by the patching material manufacturer, saturate <br /> 41 the concrete in the repair area and remove any free water at the <br /> I42 concrete surface to obtain a saturated surface dry (SSD) substrate. <br /> 43 When recommended by the patching material manufacturer, apply a <br /> 44 primer, scrub coat or bonding agent to the existing surfaces. Epoxy <br /> I <br /> 45 bonding agents, if used, shall be Type II or Type V in accordance with <br /> 46 Section 9-26.1. <br /> 47 <br /> I <br /> 48 <br /> 49 9. Place and consolidate the patching material in accordance with the <br /> manufacturer's recommendations. Work the material firmly into all <br /> 50 surfaces of the repair area with sufficient pressure to achieve proper <br /> I <br /> 51 bond to the concrete. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.