My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 6-19.AP6 <br /> 2 Section 6-19, Shafts <br /> 3 August 6, 2018 <br /> 4 6-19.2 Materials <br /> I 5 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 6 Cement Concrete" are revised to read: <br /> 7 <br /> 8 Cement 9-01 <br /> 9 Aggregates for Concrete 9-03.1 <br /> 10 <br /> 11 6-19.3(1)A Shaft Construction Tolerances <br /> 12 The last paragraph is supplemented with the following: <br /> 13 <br /> 14 The elevation of the top of the reinforcing cage for drilled shafts shall be within +6 inches <br /> 15 and -3 inches from the elevation shown in the Plans. <br /> 16 <br /> 17 6-19.3(3)C Conduct of Shaft Casing Installation and Removal and Shaft <br /> 18 Excavation Operations <br /> 19 The first paragraph is supplemented with the following: <br /> 20 <br /> 21 In no case shall shaft excavation and casing placement extend below the bottom of shaft <br /> 22 excavation as shown in the Plans. <br /> 23 <br /> ' 24 6-19.3(6)E Thermal Wire and Thermal Access Point (TAPS) <br /> 25 The third sentence of the third paragraph is revised to read: <br /> 26 <br /> ' 27 <br /> 28 The thermal wire shall extend from the bottom of the reinforcement cage to the top of the <br /> shaft, with a minimum of 5-feet of slack wire provided above the top of shaft. <br /> 29 <br /> 30 The following new sentence is inserted after the third sentence of the third paragraph: <br /> 31 <br /> 32 All thermal wires in a shaft shall be equal lengths. <br /> 33 <br /> ' 34 7-02.AP7 <br /> 35 Section 7-02, Culverts <br /> 36 April 2, 2018 <br /> 37 7-02.2 Materials <br /> 38 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 39 Cement Concrete" are revised to read: <br /> 40 <br /> 41 Cement 9-01 <br /> 42 Aggregates for Concrete 9-03.1 <br /> 43 <br /> 44 7-02.3(6)A4 Excavation and Bedding Preparation <br /> ' 45 The first sentence of the third paragraph is revised to read: <br /> 46 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.