Laserfiche WebLink
I <br /> 1 The bedding course shall be a 6-inch minimum thickness layer of culvert bedding <br /> 2 material, defined as granular material either conforming to Section 9-03.12(3) or to <br /> 3 AASHTO Grading No. 57 as specified in Section 9-03.1(4)C. <br /> 4 <br /> 5 7-05.AP7 <br /> 6 Section 7-05, Manholes, Inlets, Catch Basins, and Drywells <br /> 7 August 6, 2018 <br /> 8 7-05.3 Construction Requirements <br /> 9 The fourth sentence of the third paragraph is deleted. <br /> 10 <br /> 11 7-08.AP7 <br /> 12 Section 7-08, General Pipe Installation Requirements <br /> 13 April 2, 2018 <br /> 14 7-08.3(3) Backfilling I <br /> 15 The fifth sentence of the fourth paragraph is revised to read: <br /> 16 <br /> 17 All compaction shall be in accordance with the Compaction Control Test of Section 2- <br /> 18 03.3(14)D except in the case that 100% Recycled Concrete Aggregate is used. <br /> 19 <br /> 20 The following new sentences are inserted after the fifth sentence of the fourth paragraph: <br /> 21 <br /> 22 When 100% Recycled Concrete Aggregate is used, the Contractor may submit a written <br /> 23 request to use a test point evaluation for compaction acceptance. Test Point evaluation <br /> 24 shall be performed in accordance with SOP 738. <br /> 25 <br /> 26 8-01.AP8 <br /> 27 Section 8-01, Erosion Control and Water Pollution Control <br /> 28 April 2, 2018 <br /> 29 8-01.1 Description 1 <br /> 30 This section is revised to read: <br /> 31 <br /> 32 This Work consists of furnishing, installing, maintaining, removing and disposing of best <br /> 33 management practices (BMPs), as defined in the Washington Administrative Code (WAC) <br /> 34 173-201A, to manage erosion and water quality in accordance with these Specifications <br /> 35 and as shown in the Plans or as designated by the Engineer. <br /> 36 <br /> 37 The Contracting Agency may have a National Pollution Discharge Elimination System <br /> 38 Construction Stormwater General Permit (CSWGP) as identified in the Contract Special <br /> 39 Provisions. The Contracting Agency may or may not transfer coverage of the CSWGP to <br /> 40 the Contractor when a CSWGP has been obtained. The Contracting Agency may not <br /> 41 have a CSWGP for the project but may have another water quality related permit as <br /> 42 identified in the Contract Special Provisions or the Contracting Agency may not have <br /> 43 water quality related permits but the project is subject to applicable laws for the Work. <br /> 44 Section 8-01 covers all of these conditions. <br /> 45 <br /> 46 8-01.2 Materials <br /> 47 The first paragraph is revised to read: <br /> 1 <br />