My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 needed and the site has undergone all Stabilization identified for meeting the <br /> 2 requirements of Final Stabilization in the CSWGP. <br /> 3 <br /> 4 3. An Equitable Adjustment change order for the cost of Work that has not been <br /> 5 completed by the Contractor. <br /> 6 <br /> 7 4. Submittal of the Washington State Department of Ecology Transfer of Coverage <br /> 8 form (Ecology form ECY 020-87a) to the Engineer. <br /> 9 <br /> 10 If the Engineer approves the transfer of coverage back to the Contracting Agency, the <br /> 11 requirement in Section 1-07.5(3) for the Contractor's submittal of the Notice of <br /> 12 Termination form to the Washington State Department of Ecology will not apply. <br /> 13 <br /> 14 8-01.4 Measurement <br /> 15 This section's content is deleted and replaced with the following new subsections: <br /> 16 <br /> 17 8-01.4(1) Lump Sum Bid for Project (No Unit Items) <br /> 18 When the Bid Proposal contains the item "Erosion Control and Water Pollution <br /> 19 Prevention" there will be no measurement of unit or force account items for Work defined <br /> 20 in Section 8-01 except as described in Sections 8-01.4(3) and 8-01.4(4). Also, except as <br /> 21 described in Section 8-01.4(3), all of Sections 8-01.4(2) and 8-01.5(2) are deleted. <br /> 22 <br /> 23 8-01.4(2) Item Bids <br /> 24 When the Proposal does not contain the items "Erosion Control and Water Pollution <br /> 25 Prevention", Section 8-01.4(1) and 8-01.5(1) are deleted and the Bid Proposal will contain <br /> 26 some or all of the following items measured as noted. <br /> 27 <br /> 28 ESC lead will be measured per day for each day that an inspection is made and a <br /> 29 report is filed. ' <br /> 30 <br /> 31 Biodegradable erosion control blanket and plastic covering will be measured by the <br /> 32 square yard along the ground slope line of surface area covered and accepted. I <br /> 33 <br /> 34 Turbidity curtains will be measured by the linear foot along the ground line of the <br /> 35 installed curtain. <br /> 36 <br /> 37 Check dams will be measured per linear foot one time only along the ground line of <br /> 38 the completed check dam. No additional measurement will be made for check dams <br /> 39 that are required to be rehabilitated or replaced due to wear. <br /> 40 <br /> 41 Stabilized construction entrances will be measured by the square yard by ground <br /> 42 slope measurement for each entrance constructed. <br /> 43 <br /> 44 Tire wash facilities will be measured per each for each tire wash installed. <br /> 45 <br /> 46 Street cleaning will be measured by the hour for the actual time spent cleaning <br /> 47 pavement, refilling with water, dumping and transport to and from cleaning locations <br /> 48 within the project limits, as authorized by the Engineer. Time to mobilize the 1 <br /> 49 equipment to or from the project limits on which street cleaning is required will not <br /> 50 be measured. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.