My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> II 1 <br /> 2 Inlet protections will be measured per each for each initial installation at a <br /> 3 drainage structure. <br /> 4 <br /> 5 Silt fence, gravel filter, compost berms, and wood chip berms will be measured by <br /> 6 the linear foot along the ground line of the completed barrier. <br /> 1 7 <br /> 8 Wattles and compost socks will be measured by the linear foot. <br /> 9 <br /> 10 Temporary curbs will be measured by the linear foot along the ground line of the <br /> 11 completed installation. <br /> 12 <br /> 111 13 Temporary pipe slope drains will be measured by the linear foot along the flow line <br /> 14 of the pipe. <br /> 15 <br /> 16 Coir logs will be measured by the linear foot along the ground line of the completed <br /> 17 installation. <br /> 18 <br /> 19 Outlet protections will be measured per each initial installation at an outlet location. <br /> 1 20 <br /> 21 Tackifiers will be measure by the acre by ground slope measurement. <br /> 22 <br /> II23 8-01.4(3) Reinstating Unit Items with Lump Sum Erosion Control and Water <br /> 24 Pollution Prevention <br /> 25 The Contract Provisions may establish the project as lump sum, in accordance with <br /> II 26 Section 8-01.4(1) and also include one or more of the items included above in Section 8- <br /> 27 01.4(2). When that occurs, the corresponding measurement provision in Section 8- <br /> 28 01.4(2) is not deleted and the Work under that item will be measured as specified. <br /> 29 <br /> I <br /> 30 8-01.4(4) Items not included with LumpSum Erosion Control and Water <br /> ( ) <br /> 31 Pollution Prevention <br /> 32 Compost blanket will be measured by the square yard by ground slope surface area <br /> 33 covered and accepted. <br /> 34 <br /> 35 Mulching will be measured by the acre by ground slope surface area covered and <br /> 36 accepted. <br /> 37 <br /> 38 Seeding, fertilizing, liming, mulching, and mowing, will be measured by the acre by <br /> 39 ground slope measurement. <br /> 40 <br /> 41 Seeding and fertilizing by hand will be measured by the square yard by ground slope <br /> 42 measurement. No adjustment in area size will be made for the vegetation free zone <br /> 43 around each plant. <br /> 44 <br /> I 45 Fencing will be measured by the linear foot along the ground line of the completed fence. <br /> 46 <br /> 47 8-01.5 Payment <br /> I 48 This section's content is deleted and replaced with the following new subsections: <br /> 49 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.