My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 "Compost Berm", per linear foot. <br /> I 3 <br /> 4 "Wattle", per linear foot. <br /> 5 <br /> 6 "Compost Sock", per linear foot. <br /> 7 <br /> 8 "Coir Log", per linear foot. <br /> 9 <br /> II 10 "Temporary Curb", per linear foot. <br /> 11 <br /> 12 "Temporary Pipe Slope Drain", per linear foot. <br /> 13 <br /> 14 "Temporary Seeding", per acre. <br /> 15 <br /> 111 16 "Outlet Protection", per each. <br /> 17 <br /> 18 "Tackifier", per acre. <br /> 19 <br /> I20 "Erosion/Water Pollution Control", by force account as provided in Section 1-09.6. <br /> 21 <br /> 22 Maintenance and removal of erosion and water pollution control devices including <br /> I 23 removal and disposal of sediment, stabilization and rehabilitation of soil disturbed <br /> 24 by these activities, and any additional Work deemed necessary by the Engineer to <br /> 25 control erosion and water pollution will be paid by force account in accordance with <br /> I 26 Section 1-09.6. <br /> 27 <br /> 28 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> I 29 amount in the Proposal to become a part of the Contractor's total Bid. <br /> 30 <br /> 31 8-01.5(3) Reinstating Unit Items with Lump Sum Erosion Control and Water <br /> I 32 Pollution Prevention <br /> 33 The Contract may establish the project as lump sum, in accordance with Section 8- <br /> 34 01.4(1) and also reinstate the measurement of one or more of the items described in <br /> I 35 Section 8-01.4(2), except for Erosion/Water Pollution Control, by force account. When <br /> 36 that occurs, the corresponding payment provision in Section 8-01.5(2) is not deleted and <br /> 37 the Work under that item will be paid as specified. <br /> I 38 <br /> 39 8-01.5(4) Items not included with Lump Sum Erosion Control and Water <br /> 40 Pollution Prevention <br /> 41 Payment will be made for each of the following Bid items when they are included in the <br /> 42 Proposal: <br /> 43 <br /> 44 "Compost Blanket", per square yard. <br /> i 45 <br /> 46 "Mulching", per acre <br /> 47 <br /> 48 "Mulching with PAM", per acre <br /> 49 <br /> 50 "Mulching with Short-Term Mulch", per acre. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.