My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 "Mulching with Moderate-Term Mulch", per acre. <br /> 3 <br /> 4 "Mulching with Long-Term Mulch", per acre. <br /> 5 <br /> 6 "Seeding, Fertilizing and Mulching", per acre. <br /> 7 <br /> 8 "Seeding and Fertilizing", per acre. <br /> 9 <br /> 10 "Seeding and Fertilizing by Hand", per square yard. <br /> 11 <br /> 12 "Second Application of Fertilizer", per acre. <br /> 13 <br /> 14 "Liming", per acre. <br /> 15 <br /> 16 "Mowing", per acre. <br /> 17 <br /> 18 "Seeding and Mulching", per acre. <br /> 19 <br /> 20 "High Visibility Fence", per linear foot. <br /> 21 <br /> 22 8-02.AP8 <br /> 23 Section 8-02, Roadside Restoration <br /> 24 January 2, 2018 <br /> 25 8-02.2 Materials 1 <br /> 26 The reference to the material "Soil" is revised to read "Topsoil". <br /> 27 <br /> 28 8-02.5 Payment <br /> 29 The following new paragraph is inserted following the Bid item "Plant Selection ", per each: <br /> 30 <br /> 31 The unit Contract price for"Plant Selection ", per each shall be full pay for all Work to I <br /> 32 perform the work as specified within the planting area prior to planting for weed control, <br /> 33 planting area preparation and installation of plants with initial watering. <br /> 34 <br /> 35 The paragraph following the Bid item "PSIPE ", per each is revised to read: <br /> 36 <br /> 37 The unit Contract price for"PSIPE ", per each, shall be full pay for all Work to perform <br /> 38 the work as specified within the planting area for weed control and planting area <br /> 39 preparation, planting, cleanup, and water necessary to complete planting operations as <br /> 40 specified to the end of first year plant establishment. <br /> 41 <br /> 42 8-04.AP8 <br /> 43 Section 8-04, Curbs, Gutters, and Spillways <br /> 44 April 2, 2018 <br /> 45 8-04.2 Materials <br /> 46 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 47 <br /> 48 Cement 9-01 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.