My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 1 <br /> 2 8-20.2(1) Equipment List and Drawings <br /> 3 <br /> 4 8-20.3(4) Foundations <br /> 5 The second sentence of the first paragraph is revised to read: <br /> 6 <br /> 7 Concrete for Type II, Ill, IV, V, and CCTV signal standards and light standard foundations <br /> 8 shall be Class 4000P and does not require air entrainment. <br /> 9 <br /> 10 8-20.3(5)A General <br /> 11 The last two sentences of the last paragraph is deleted. <br /> 12 <br /> 13 This section is supplemented with the following: <br /> 14 <br /> 15 All conduits shall include a pull tape with the equipment grounding conductor. The pull <br /> 16 tape shall be attached to the conduit near the end bell or grounded end bushing, or to <br /> 17 duct plugs or caps if present, at both ends of the conduit. <br /> 18 <br /> 19 8-20.3(8) Wiring I <br /> 20 The seventeenth paragraph is supplemented with the following: <br /> 21 <br /> 22 Pulling tape shall meet the requirements of Section 9-29.1(10). Pull string may not be <br /> 23 used. <br /> 24 <br /> 25 8-20.3(14)C Induction Loop Vehicle Detectors <br /> 26 Item number 2 is deleted. <br /> 27 <br /> 28 Item numbers 3 through 12 are renumbered to 2 through 11, respectively. <br /> 29 <br /> 30 8-21.AP8 <br /> 31 Section 8-21, Permanent Signing <br /> 32 January 2, 2018 <br /> 33 8-21.3(9)F Foundations <br /> 34 Item number 3 of the twelfth paragraph is supplemented with the following new sentence: <br /> 35 <br /> 36 Class 4000P concrete for roadside sign structures does not require air entrainment. <br /> 37 1 38 9-02.AP9 <br /> 39 Section 9-02, Bituminous Materials <br /> 40 April 2, 2018 1 <br /> 41 9-02.1 Asphalt Material, General <br /> 42 The second paragraph is revised to read: <br /> 43 <br /> 44 The Asphalt Supplier of Performance Graded (PG) asphalt binder and emulsified asphalt <br /> 45 shall have a Quality Control Plan (QCP) in accordance with WSDOT QC 2 "Standard <br /> 46 Practice for Asphalt Suppliers That Certify Performance Graded and Emulsified <br /> 47 Asphalts". The Asphalt Supplier's QCP shall be submitted and receive the acceptance of <br /> 48 the WSDOT State Materials Laboratory. Once accepted, any change to the QCP will <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.