My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 8-14.AP8 <br /> 2 Section 8-14, Cement Concrete Sidewalks <br /> I3 April 2, 2018 <br /> 4 8-14.2 Materials <br /> 1 5 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 6 <br /> 7 Cement 9-01 <br /> 8 <br /> 1 9 In the second paragraph, each reference to "Federal Standard 595" is revised to read "SAE <br /> 10 AMS Standard 595". <br /> 11 <br /> I 12 8-16.AP8 <br /> 13 Section 8-16, Concrete Slope Protection <br /> 14 April 2, 2018 <br /> I15 8-16.2 Materials <br /> 16 In the first paragraph, the last two material references are revised to read: <br /> I 17 <br /> 18 Poured Portland Cement or Blended Hydraulic Cement <br /> 19 Concrete Slope Protection 9-13.5(2) <br /> 20 Pneumatically Placed Portland Cement or Blended <br /> 21 Hydraulic Cement Concrete Slope Protection 9-13.5(3) <br /> 22 <br /> I 23 8-17.AP8 <br /> 24 Section 8-17, Impact Attenuator Systems <br /> 25 August 6, 2018 <br /> I26 8-17.3 Construction Requirements <br /> 27 This section is supplemented with the following: <br /> 28 <br /> 111 29 Impact attenuators shall meet the crash test and evaluation criteria of NCHRP 350 or the <br /> 30 Manual for Assessing Safety Hardware (MASH). <br /> 31 <br /> I 32 8-20.AP8 <br /> 33 Section 8-20, Illumination, Traffic Signal Systems, Intelligent Transportation <br /> 34 Systems, and Electrical <br /> 111 35 August 6, 2018 <br /> 36 8-20.1(1) Regulations and Code <br /> I 37 The last paragraph is revised to read: <br /> 38 <br /> 39 Persons performing electrical Work shall be certified in accordance with and supervised <br /> I 40 as required by RCW 19.28.161. Proof of certification shall be worn at all times in <br /> 41 accordance with WAC 296-46B-942. Persons failing to meet these certification <br /> 42 requirements may not perform any electrical work, and shall stop any active electrical <br /> I <br /> 43 work, until their certification is provided and worn in accordance with this Section. <br /> 44 <br /> 45 8-20.2(2) Equipment List and Drawings <br /> i46 This section is renumbered: <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.