My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 9-03.21(1)E Table on Maximum Allowable percent (By Weight) of Recycled <br /> 2 Material <br /> 3 "Portland Cement" is deleted from the first two rows in the table. <br /> 4 <br /> 5 The first column of the third row is revised to read: <br /> 6 <br /> 7 Coarse Aggregate for Commercial Concrete and Class 3000 Concrete <br /> 8 <br /> 9 9-04.AP9 <br /> 10 Section 9-04, Joint and Crack Sealing Materials <br /> 11 April 2, 2018 <br /> 12 9-04.1(2) Premolded Joint Filler for Expansion Joints <br /> 13 In this section, each reference to "AASHTO T 42" is revised to read "ASTM D 545". <br /> 14 <br /> 15 9-04.2(1)A1 Hot Poured Sealant for Cement Concrete Pavement <br /> 16 This section is supplemented with the following: <br /> 17 <br /> 18 Hot poured sealant for cement concrete pavement is acceptable for installations in joints <br /> 19 where cement concrete pavement abuts a bituminous pavement. <br /> 20 <br /> 21 9-04.2(1)A2 Hot Poured Sealant for Bituminous Pavement <br /> 22 This section is supplemented with the following: <br /> 23 <br /> 24 Hot poured sealant for bituminous pavement is acceptable for installations in joints where <br /> 25 cement concrete pavement abuts a bituminous pavement. <br /> 26 <br /> 27 9-04.2(1)B Sand Slurry for Bituminous Pavement <br /> 28 Item number 2 of the first paragraph is revised to read: <br /> 29 <br /> 30 2. Two percent portland cement or blended hydraulic cement, and <br /> 31 <br /> 32 9-04.3 Joint Mortar <br /> 33 The first paragraph is revised to read: <br /> 34 <br /> 35 Mortar for hand mortared joints shall conform to Section 9-20.4(3) and consist of one part <br /> 36 portland cement or blended hydraulic cement, three parts fine sand, and sufficient water <br /> 37 to allow proper workability. <br /> 38 <br /> 39 9-05.AP9 <br /> ' 40 Section 9-05, Drainage Structures and Culverts <br /> 41 April 2, 2018 <br /> 42 9-05.3(1)C Age at Shipment <br /> 43 The last sentence of the first paragraph is revised to read: <br /> 44 <br /> 45 Unless it is tested and accepted at an earlier age, it shall not be considered ready for <br /> 46 shipment sooner than 28 days after manufacture when made with Type II portland cement <br /> 47 or blended hydraulic cement, nor sooner than 7 days when made with Type Ill portland <br /> 48 cement. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.