My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 9-08.AP9 , <br /> 2 Section 9-08, Paints and Related Materials <br /> 3 January 2, 2018 1 <br /> 4 9-08.1(2)K Orange Equipment Enamel <br /> 5 In the second sentence of the first paragraph, the reference to "Federal Standard 595" is 1116 revised to read "SAE AMS Standard 595". <br /> 7 <br /> 8 9-08.1(8) Standard Colors <br /> 9 In the first paragraph, the reference to "Federal Standard 595" is revised to read "SAE AMS <br /> 10 Standard 595". <br /> 11 <br /> 12 9-13.AP9 <br /> 13 Section 9-13, Riprap, Quarry Spalls, Slope Protection, and Rock for Erosion <br /> 14 and Scour Protection and Rock Walls <br /> 15 April 2, 2018 I <br /> 16 9-13.1(1) General <br /> 17 The last paragraph is revised to read: <br /> 18 <br /> 19 Riprap and quarry spalls shall be free from segregation, seams, cracks, and other defects <br /> 20 tending to destroy its resistance to weather and shall meet the following test <br /> 21 requirements: <br /> 22 <br /> 23 9-13.5 Concrete Slope Protection <br /> 24 This section is revised to read: <br /> 25 <br /> 26 Concrete slope protection shall consist of reinforced portland cement or blended <br /> 27 hydraulic cement concrete poured or pneumatically placed upon the slope with a <br /> 28 rustication joint pattern or semi-open concrete masonry units placed upon the slope <br /> 29 closely adjoining each other. <br /> 30111 <br /> 31 9-13.5(2) Poured Portland Cement Concrete Slope Protection <br /> 32 This section's title is revised to read: <br /> 33 <br /> 34 Poured Portland Cement or Blended Hydraulic Cement Concrete Slope <br /> 35 Protection <br /> 36 <br /> 37 9-13.5(3) Pneumatically Placed Portland Cement Concrete Slope Protection <br /> 38 This section's title is revised to read: <br /> 39 <br /> 40 Pneumatically Placed Portland Cement or Blended Hydraulic Cement <br /> 41 Concrete Slope Protection <br /> 42 <br /> 43 The first paragraph is revised to read: <br /> 44 <br /> 45 Cement — This material shall be portland cement or blended hydraulic cement as I <br /> 46 specified in Section 9-01. <br /> 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.