My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 1 9-13.7(1) Rock for Rock Walls and Chinking Material <br /> 2 The first paragraph (up until the colon) is revised to read: <br /> I 3 <br /> 4 Rock for rock walls and chinking material shall be hard, sound and durable material, free <br /> 5 from seams, cracks, and other defects tending to destroy its resistance to weather, <br /> 6 and shall meet the following test requirements: <br /> I <br /> 7 <br /> 8 9-14.AP9 <br /> 9 Section 9-14, Erosion Control and Roadside Planting <br /> I10 August 6, 2018 <br /> 11 9-14.4(2) Hydraulically Applied Erosion Control Products (HECPs) <br /> I 12 In Table 1, the last four rows are deleted. <br /> 13 <br /> 14 9-14.4(2)A Long-Term Mulch <br /> I 15 The first paragraph is supplemented with the following: <br /> 16 <br /> 17 Products containing cellulose fiber produced from paper or paper components will not be <br /> I 18 accepted. <br /> 19 <br /> 20 Table 2 is supplemented with the following new rows: <br /> I 21 <br /> Water Holding Capacity ASTM D 7367 800 percent minimum <br /> Organic Matter Content AASHTO T 267 90 percent minimum <br /> I Seed Germination <br /> Enhancement ASTM D 7322 Long Term <br /> 420 percent minimum <br /> 22 <br /> I 23 <br /> 24 9-14.4(2)B Moderate-Term Mulch <br /> 25 This section is revised to read: <br /> 26 <br /> 27 Within 48 hours of application, the Moderate-Term Mulch shall bond with the soil surface <br /> 28 to create a continuous, absorbent, flexible, erosion-resistant blanket. Moderate-Term <br /> 29 Mulch shall effectively perform the intended erosion control function in accordance with <br /> 111 30 Section 8-01.3(1) for a minimum of 3 months, or until temporary vegetation has been <br /> 31 established, whichever comes first. <br /> 32 <br /> I 33 Moderate-Term Mulch shall not be used in conjunction with permanent seeding. <br /> 34 <br /> 35 9-14.4(2)C Short-Term Mulch <br /> I 36 This section is revised to read: <br /> 37 <br /> 38 Short-Term Mulch shall effectively perform the intended erosion control function in <br /> I 39 accordance with Section 8-01.3(1) for a minimum of 2 months, or until temporary <br /> 40 vegetation has been established, whichever comes first. Short-Term Mulch shall not be <br /> 41 used in conjunction with permanent seeding. <br /> 42 <br /> I <br /> I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.