My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 9-16.AP9 I <br /> 2 Section 9-16, Fence and Guardrail <br /> 3 August 6, 2018 I <br /> 4 9-16.3(1) Rail Element <br /> 5 The last sentence of the first paragraph is revised to read: <br /> 6 <br /> 7 All rail elements shall be formed from 12-gage steel except for thrie beam reducer <br /> 8 sections, reduced length thrie beam rail elements, thrie beams used for bridge rail <br /> 9 retrofits, and Design F end sections, which shall be formed from 10-gage steel. <br /> 10 <br /> 11 9-16.3(5) Anchors <br /> 12 The last paragraph is revised to read: <br /> 13 <br /> 14 Cement grout shall conform to Section 9-20.3(4) and consist of one part portland cement <br /> 15 or blended hydraulic cement and two parts sand. I <br /> 16 <br /> 17 9-18.AP9 <br /> 18 Section 9-18, Precast Traffic Curb <br /> 19 April 2, 2018 <br /> 20 9-18.1(1) Aggregates and Proportioning <br /> 21 Item number 1 of the first paragraph is revised to read: <br /> 22 <br /> 23 1. Portland cement or blended hydraulic cement shall conform to the requirements of <br /> 24 Section 9-01 except that it may be Type I portland cement conforming to AASHTO 111 <br /> 25 M 85. <br /> 26 <br /> 27 9-20.AP9 <br /> 28 Section 9-20, Concrete Patching Material, Grout, and Mortar <br /> 29 August 6, 2018 <br /> 30 9-20.1 Patching Material <br /> 31 This section, including title, is revised to read: <br /> 32111 <br /> 33 9-20.1 Patching Material for Cement Concrete Pavement <br /> 34 Concrete patching material shall be prepackaged mortar extended with aggregate. The <br /> 35 amount of aggregate for extension shall conform to the manufacturer's recommendation. <br /> 36 <br /> 37 Patching mortar and patching mortar extended with aggregate shall contain cementitious <br /> 38 material and conform to Sections 9-20.1(1) and 9-20.1(2). The Manufacturer shall use <br /> 39 the services of a laboratory that has an equipment calibration verification system and a <br /> 40 technician training and evaluation process in accordance with AASHTO R 18 to perform <br /> 41 all tests specified in Section 9-20.1. <br /> 42 <br /> 43 9-20.1(1) Patching Mortar <br /> 44 Patching mortar shall conform to the following requirements: <br /> 45 <br /> Compressive Strength ASTM Test Method Specification <br /> at 3 hours C 39 Minimum 3,000 psi <br />
The URL can be used to link to this page
Your browser does not support the video tag.