Laserfiche WebLink
p: <br /> PUBL/C f�YOR/�C5 <br /> r <br /> i� � ( c- � - c>r� <br /> December 14, 2010 <br /> Jean Costanti-Oehler <br /> Facilities Director <br /> Compass Health <br /> 4526 Federai Avenue, MS-70 <br /> Everett WA 98203 <br /> RE: Northstar Apartments <br /> Dear Jean; <br /> This is in response to your letter dated December 13, 2010. For ease of conversation, the <br /> questions are responded to in numerical format; however the original document posted the <br /> questions in bullet form. Please note that I am not currently able to completely respond to the <br /> questions posted. The code contains many requirements that have several possible solutions <br /> that are chosen by the design team and not prescribed by the jurisdiction. Rather than respond <br /> with a chain of if/than scenarios, I have tried to follow the design parameters as previously <br /> discussed, however the bulk of discussion is still based on assumption and probable decisions <br /> that need to be further substantiated by analysis from the design team. <br /> 1. Occupancy type: Based on the description of occupants living in the building and <br /> services provided for the occupants, the building should be shown to comply with the <br /> provisions within the current code for a Group I-1 and S-2 Occupancy. As the building <br /> was previously a Group R/S-2 Occupancy, the change of occupancy requirements of <br /> Section 3408 will be required to be followed. <br /> 2, sprinkier and fire alarm requirements: Everett Municipal Code chapter 16.76 and <br /> the 2006 IBC each require the building to be fully alarmed and sprinklered. Section <br /> � 903.2.6 of the IBC permits an NFPA 13 or 13R system in the Group I-1 Occupancy. <br /> � Although a sprinkler system is required throughout the structure based on the <br /> occupancy type, the type of sprinkler is not specified. The type of sprinkler chosen for <br /> this project will create differences in requirements for many things referred to in the <br /> initial letter. <br /> 3. Draft stops: Draftstops in hurizontal assemblies are not required for this building when <br /> Ij sprinkled with an NFPA 13 system per Section 717.3.3. NFPA 13 contains additional <br /> requirements; however one method of compliance is that spaces rr�ust be firestopped <br /> into volumes not to exceed 160 cubic feet. <br /> 4. Type of construction: Type V-A construction is permitted for Group I-1 Occupancies. <br /> A full building code analysis will need to be provided to determine whether or not thi� <br /> building complies as V-A construction, with or without the area separation wall, and with <br /> y2 <br /> _:;Ory;•")!lor9ubr F[crtmcn;: <br /> ENGWEI=RIVG/ PUBLIC SEf�!ICFc nlVlz':nN � '?00 Codar Street• Everett, WA 98201 • (425)257-SS00• Fax(4'�Si='i' %3ft�6 <br />