My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2727 MAPLE ST EVERETT SELF STORAGE 2018-01-01 MF Import
>
Address Records
>
MAPLE ST
>
2727
>
EVERETT SELF STORAGE
>
2727 MAPLE ST EVERETT SELF STORAGE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 2:35:49 PM
Creation date
11/13/2018 2:32:11 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2727
Tenant Name
EVERETT SELF STORAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ., . <br /> FINAL MITIGATED <br /> DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA Oi34•98 <br /> Everett Self-Storage <br /> June 15, 1998 <br /> DESCRIPTION OF PROPOSAL: The proposed action is the demolition of existing <br /> structures and the construction of a four story self-storage facility. <br /> FROPONENT: Chase Development <br /> PO Box 122 <br /> Snohomish, WA 98291 <br /> PROPONENT'S <br /> REPRESENTATIVE: George Fischer <br /> same as applicant <br /> LOCATION: 2727 Maple Street <br /> ZONING: C-1, General Commercial <br /> GENERAL PLAN: 4.2 <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Michaei Palacios Phone: 257-8731 <br /> AAitiflation Measures: <br /> The environmental impacts of tliis proposal are documented in the Environmental <br /> Checklist and other informatic;i on file with the City. The listed requirements are placed <br /> in response to our review of this information: <br /> AGENCIES WITH JURISDICTION <br /> W.S.D.O.T. <br /> MI'TIGATION OF ADVERSE iMPACTS BY SEPA <br /> 1. The proposed alley vacation and all signing and physical changes required to <br /> complete the alley vacation must be completed pnor to issuance of an;� building <br /> permits. (SEPA Transportation Policies) <br /> 2. Any grading/fill on this site shall be done so as not to im;�• ^t the surrounding <br /> properties. (SEPA Land and Shoreline Use Policies.) <br /> 3. A new sidewalk is required connecting from the sidewalk on Maple Street to the <br /> sidewalk on Walnut Street. Dc�dication of right-of-way on the west edge of the <br /> cul-de-sac on Walnut will be required to accammodate the new sidewalk. <br /> Fencing to �epartment of Transportation standards will be required for the <br /> sidewalk along the Califomia Street frontage. (SEPA Transportation Policies) <br /> 4. Gates shall be used to prevent access to the site from Walnut Street. Walnut <br /> Street accesses shall be "Exit Only". (SEPA Transportation Policies) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.