My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST GROUP HEALTH 2018-01-01 MF Import
>
Address Records
>
MAPLE ST
>
2930
>
GROUP HEALTH
>
2930 MAPLE ST GROUP HEALTH 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 3:36:20 PM
Creation date
11/13/2018 2:52:51 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
GROUP HEALTH
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
703
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORN�TION FOR DEVSLOpER; <br /> 1. Detailed drawings in accordance with City Design and <br /> Construction Standards shall be submitted to the Public Works <br /> Department showinq site parking layout, landscaping, utilities, <br /> storm drainage, temporary construction erosion control, and all <br /> required improvements in the public right-of-way. Public Works <br /> Department approval of these drawings is required prior to any <br /> permits being issued. All improvements shall be completed, <br /> approved, and warranted before occupancy permits are issued. <br /> 2. The sidewalks along the property's frontage on Maple Street must <br /> � be replaced per City standards. <br /> 3. A backwater valve shall be required for this building's sanitary <br /> side sewer. <br /> 4. Special charges for connection to the public sewer and water <br /> systems in accordance with Ordinance 1171-85 and subsequent <br /> revision are applicable. These charges are based on p�ojected <br /> water usage and can be substantial. The Applicant is encouraged <br /> to obtain a copy of the ordinance and determine estimated <br /> charges prior to building permit application. Tt.e actual cost <br /> shall be computed by the Public Works Department per the <br /> ordinance in effect at the time of building permit issuance. <br /> 5. An automatic sprinkler system is required for this buildinq per <br /> City ordinance. <br /> 6. City streets are to he kept clear of dirt and debris at all <br /> times during construction. Dust suppression and street cleaning <br /> must occur as directed by the Public Works Inspector. <br /> 7. Permits must be obtained for all fill removed from the site and <br /> placed within the City limits. <br /> 8. Performance guarantees are required for sidewalk improvements. <br /> 9. A one-year guarantee is required on the public improvements for <br /> an amount not less than 10� of the cost of construction and <br /> shall run for one year from the date of issuance of the first <br /> Occupancy Permit for the project. <br /> 10. A two-year guarantee is required for private retention/detention <br /> or other drainage treatment/abatement facilities serving areas <br /> larger than one acre. <br /> 11. A minimum of two (2) loading/unloading berths is required for <br /> this proposal, per Subsection 34.090.B of the Zoning Code. <br /> Note: The current site plan, dated September 3 , 1992, shows <br /> only one loading berth. The City's Traffic Engineer must <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.