Laserfiche WebLink
�-� <br /> if a rearrangement of existing cables on premise or on t:ie <br /> riqht-of-way is necessary, appropriate charges will be estimated <br /> and GTF's Guaranty of Payment form will be forwarded to you for <br /> your signature. Prior to commencement of GTE's engineering for <br /> such rearrangement, a deposit will be required. To insure <br /> timely telephone service, GTE requests ninety (90) days lead <br /> time for enqineering, procurement, and installation of cable <br /> and/ or GTE's equipment. <br /> Please contact Dick Hayer, Senior Engineer, at 356-4053 should <br /> you require additional information. <br /> ' 31. The Washington State Clean Air Act requires the use of all <br /> known, available, and reasonable means of controllinq air <br /> pollution, including dust. Dust generated during construction <br /> activities can be controlled by wetting those dust sources such <br /> as areas of exposed soils, washinq truck wheels before they <br /> leave the site, and installinq and maintaining gravel <br /> construction entrances. Construction vehicle track-out is also <br /> a major dust source. Any evidence of track-out can triqger <br /> violations and fines from the Department of Ecology or the Puqet <br /> Sound Air Pollution Control Agency. (SEPA Natural <br /> Environment/?,ir Quality Policies) <br />