Laserfiche WebLink
--rs----�r <br /> � c. A monitored fire and intrusion alarm system zoned for each <br /> entity should be provided, especially in narcotics area and <br /> narcotics cabinets. Install remote (duress) panic sensors <br /> for staff and/or foot trip for reception and office desks. <br /> d. If offices will be handling cash, an actual money safe <br /> should be installed (for next day receipts only) . <br /> e. The perimeter doors should have with double dead-bolts or <br /> locking crashbar, if doors open to the outside, or hinges <br /> are exposed, pin hinges should be provided. <br /> f. If store front glass doors are part of the project, they <br /> should have locking case bolts top and bottom. The door <br /> � should have a maximum security deadbolt with 1-3/4" '.:hrow <br /> and 3/4" laminated steel. <br /> q. Any narcotics cabinets should have at least 1/4 inch welded <br /> steel plate with 3/8 inch case hardened steel hasp and 1/2 <br /> inch case hardened steel shackle padlock. Padlock should be <br /> further shielded with at least 1 1/4 inch welded steel <br /> plating to deter bolt cutters. � <br /> h. The more business non-opening windows that are visible to <br /> the parking area, the safer the area is from assaults and <br /> thefts. <br /> i. Understructure parking areas shou.id have walls painted white <br /> and security gated entrance to deter assaults, vandalism and <br /> prowls. <br /> h. Outside stairwells should have security gated entrances. <br /> 29. The Snohomish County PUD currently has sufficient capacity to <br /> serve the proposed development. For information about the <br /> electrical service requirements for this project, please call <br /> Mike Brust at the District's Customer Engineering Office, <br /> Everett at 258-8291 . <br /> 30. GTE Northwest Incorporated will provide service to the site. <br /> However, new telephone cable construction will be required in <br /> conjunction with the site development. GTE's engineering will <br /> beqin when they are notified of your construction schedules and <br /> telephone requirements. <br /> it will be the developer's responsibility to provide a suitable <br /> combination of conduit and trenching and/or riser conduit to <br /> accommodate GTE's network communications cable within the <br /> complex. Provided that an acceptable combination of conduit <br /> and/or trenchi�q are incorporated into the project to <br /> accommodate GTE's entrance c�ble, there will be no costs to the <br /> developer for GTE's cable. <br /> 7 <br />