Laserfiche WebLink
• '��:ri, -�. .. <br /> ' '�;i�-.�- .1Ms <br /> PUBL/C I�I/O/uG� <br /> ,�.,:,°. <br /> ���►�� <br /> April 19, 1993 <br /> Mr. Jce Nevenschwander <br /> Group Health Cooperadve Facilities Department <br /> 521 Wall Street <br /> SeatUe, Washington 98121 <br /> � RE: Owner: Group Health Cooperative Department <br /> Job Address: 2930 Maple Street <br /> Plan Check No: B-39803 <br /> Dear Jce: <br /> In response to your application for a construction permi[, your plans have been examined and you <br /> aze advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issues only, additional revisions or addidons may be required by other <br /> departments (such as Udlities, Planning or Fire). All references refer to the 1991 Uniform <br /> ` Building Code, zs amended by the State of Washington and/or Washington State Energy Code <br /> 1991, 2nd Edition, unless stated otherwise. <br /> .�1. Final partidon layouts and details shall be submitted prior to installadon to verify compliance <br /> with occupancy, fire-resistive, structural and exit requirements. 'This item applies to the shell <br /> spaces on levels PI and C2. <br /> f2. Plans shall conform with Chapter 5 as follows: <br /> fa. Table No. 5-A for wall and opening protection. This item applies to the windows shown <br /> in the south wall of stair 100S 1 (openings are not permitted less than 5 feet from propeRy <br /> lines). <br /> ✓�. Table 5-B for occupa�icy separadons. This item applies to the wall between pazking P100 <br /> and the lobby P100L] (1 hour occupancy separation is required). <br /> ✓3. Parapet wall height and construction shall be not less than indicated in Section 1710. This <br /> item applies to the north wall at level P5. <br /> ,/4. Provide a smooth, Hazd, nonabsorbent surface on floors and walls of toilet rooms per Secdon <br /> 510(b). Several of the toilet room elevations do not indicate wall surfaces. In addition, <br /> interior elevation (s) are required for the other single toilet rooms. <br /> ✓5. Overflow drains having the same size as roof drains and on independent drain lines are <br /> required. In lieu of this, overflow scuppers three times the size of roof drains can be installed <br /> in parapet walls. The overflow drain system is requireci to have inlets located 2 inches above <br /> the low point of the roof. Su;tion 3207(c). This item applies exposed parking on levels P4, <br /> PS and to the roof decks. <br /> R�I�W�� rr-GLLIY� oUCda E�� � h� �'��b'-I-t�u.Y> R�� �2Jo <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (206) 259-8800• Fax (206) 259•8856 � <br />