My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1828 MCDOUGALL AVE BROADWAY HARDWARE 2018-01-01 MF Import
>
Address Records
>
MCDOUGALL AVE
>
1828
>
BROADWAY HARDWARE
>
1828 MCDOUGALL AVE BROADWAY HARDWARE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 8:09:41 AM
Creation date
11/14/2018 8:08:33 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
1828
Tenant Name
BROADWAY HARDWARE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� <br />9H <br />p�5 <br />C H <br />9 H fn <br />H �H <br />�e o <br />H #1 <br />"�a H i1 <br />�� <br />��� <br />�/��g <br />y� V � <br />L'>" H � <br />(�i� y <br />M <br />C] Cy N <br />��M <br />H O cyi� <br />�LANN/NG AND <br />OMMUN/TY DEL/ELOPA7ENT <br />MEMORANDUM <br />T0: File, Rezone #1-90, Broadway Hardware <br />Allan Giffen, Planning Department� <br />FROM: 1g93 <br />DATE: January 29, <br />STJBJECT: Parking Lot Landscaping <br />Paul A. Roberts <br />Director <br />SF��, �D/02(i <br />I�ZZ rvl�pduga//4�+e <br />On January 15, Z met with Steve Griffin, owner of Broadway Hardware, <br />and Bob Turner, his landscaping contractor to discuss completion of <br />the parking lot landscaping. It was agreed that the foilowing <br />revisions be made to the landscaping plan submitted by his architect <br />and approved hy the City: <br />1) The vine maple trees in the landscaping area be changed to Nor.way <br />map1= trees; <br />Z) The irrigation system be drip irrigation; <br />3) The kinnick kinnick groundcover be changed to St. John's wort; <br />q) The lawn shown along the north and south sides of the parking lot <br />be re�laced by St. John's wort; <br />5) It was clariiied that the berm requirement applies only to the <br />McDougall frontage and not to the north and south property lines <br />or tree islands. <br />In addition to the changes noted to the ofnthe�pssuance of the Public <br />that the January 9 one year anniversary <br />Works permit for the parking lot, which is the time specified in the <br />Resolution of Intent to Rezone by which the improvements for the <br />property were to be completed, would be extended until April 1, 1993, <br />due to the freezing weather and probable plant loss under these <br />c�nditions. In the meantime, Steve agreed to remove all of the weeds <br />tl�nt had grown in the perimeter landscape area. Public Works has <br />indicated that, with the exception of the striping and landscaping, <br />the parking lot construction is complete. <br />When the landscaping and striping has been completed, the rezone of <br />the property will be finalized by City Council adoption of a rezone <br />ordinance. <br />I met again today with Steve, Bob Turner, and Libbie Soden and John <br />Olson of the Parks Department to dis��ussSPncetthe landscapingrplan was <br />along the frontage of the parking <br />originally approved, Parks has planted street trees along the planting <br />frompJohnManduLibby,ethePstreetrtreesfshown ontthe planamustnbeomments <br />1 <br />Location: 7_731 Wetmore Avenue <br />CITY OF EVERETT • 3002 Wetmore • Everetf, WA 98201 •(206) 259•8731 • Fax (206) 259-8742 • Scan: 723-8731 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.