My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 MCDOUGALL AVE COMMERCIAL OFFICE FOR ROBERTS 2018-01-01 MF Import
>
Address Records
>
MCDOUGALL AVE
>
3120
>
COMMERCIAL OFFICE FOR ROBERTS
>
3120 MCDOUGALL AVE COMMERCIAL OFFICE FOR ROBERTS 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 9:15:11 AM
Creation date
11/14/2018 8:54:06 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3120
Tenant Name
COMMERCIAL OFFICE FOR ROBERTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � � <br />0 <br />Botesch, Nash & Hall Architects, P.S. <br />April 15, 1996 <br />Mr. Jeff McFall <br />City of Everett Building Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Roberts Office Building <br />Plan Check No. B50727 <br />Dear Jeff: <br />o C��L��d� � <br />L� <br />�RR i � 1�96 <br />....... <br />CITY OF...EYE�@Tj'..... <br />�I�. Permit �uuter <br />Please see the following responses to your comments for the permit review. <br />Drawing revisions have been clouded on the plans with a revision date of 4/15/96. <br />Attached are two complete revised drawing sets and product data as required. <br />1. Group 3 occupancies over 3,000 square feet shall be equipped with an <br />a�tomatic fire detection system (fire alarm system) per City Ordinance 1902- <br />92. <br />• The complete fire alarm system will be designed by installer per electrical <br />specification. <br />2. Fire/smoke dampers shall be instalied at duct penetrations per Section 713.10. <br />This item applies to ail duct penetrations of 1st and 2nd floor, lobby/corridor <br />areas. Also transfer grills are not allowed into these areas. <br />• Air is taken from lobby/corridor area into work room area. This is noted on <br />mechanical revision notes. <br />3. Ronf drains shall be connected to the storm sewer. <br />�� See civil sheet 1. <br />4. {=oam plastic insulation useti in a roof covering assembly shall comply with <br />Section 2602. <br />• Insulation shail comply as stated in the sFecifications. <br />5. Foam plastic insulation must comply with Section 2602. <br />• Insulation shall comply as stated in the specifications. <br />6. Skylights shall comply with Chapter 24. Please indicate size, location and <br />framing un structural plans. Please also provide U= 1.45 maximum. <br />4206 Hoyt Avenue • Everett, Washington 98203 • 206/259-C868 • 206/774-33 ;I • FAX ^' �2-4334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.