My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IH. ACCEPTANCE OF WORK <br /> I A. Upon completion of the Project, including, but not limited to, record drawings, as-builts, required reports <br /> and operations and maintenance manuals, the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification, the Owner's Representative will promptly, by personal <br /> inspection, determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> I Owner's Representative finds materials, Equipment, or workmanship that do not meet the terms of the <br /> Contract, he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor, the Owner's Representative will notify the Owner <br /> I that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete, the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> IARTICLE 6 CHANGES <br /> IA. OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> A. The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> I Contract nor release the surety, and the Contractor agrees to perform the Work as changed. Among others, <br /> these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work,Equipment or material to be provided under this Contract, and <br /> I 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> I 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities,Equipment, materials, services, or sites,provided by the Owner, and <br /> I7. Ordering the Contractor to accelerate or Delay Work. <br /> B. If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> I and Contract Time, the Owner may, at its sole option, unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> Contractor without explicit notice from the Owner to proceed. <br /> IB. EXTRA WORK <br /> A. At its sole option, the Owner may (1) perform Extra Work itself, (2) employ others to do it, (3) direct the <br /> Contractor to perform the Extra Work at existing unit bid price, (4) direct the Contractor to perform the <br /> Extra Work at a mutually agreed upon price, or (5) direct the Contractor to perform the Extra Work on a <br /> Force Account basis. <br /> rC. CHANGE ORDERS <br /> A. Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. Payment <br /> I For Changes. Requests for an increase in Contract Time must be made as provided in 5.2.0 Extensions of <br /> Contract Time, as applicable. Substantial changes in Contract Time, Contract Sum or Work will often be <br /> negotiated and agreed between the Contractor and Owner before the Owner directs the Contractor to <br /> Iproceed with the change. <br /> I 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 1 00 72 13-27 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.