My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> C. Full compliance by the Contractor with the provisions of this section is a contractual condition precedent to <br /> the Contractor's right to sue or seek any recovery against the Owner in any legal proceeding. <br /> B. CONTENTS I <br /> A. All Contract Claims filed by the Contractor shall be in writing, verified under penalty of perjury by an <br /> officer or principal of the Contractor, and in sufficient detail to enable the Owner's Representative to <br /> ascertain the basis and amount of the Contract Claim. All Contract Claims shall be submitted to the <br /> Owner's Representative. At a minimum, each Contract Claim must include: <br /> 1. A detailed factual statement of the Contract Claim for additional compensation and extension of <br /> Contract Time, if any, providing all necessary dates, locations, and items of work affected by the <br /> Contract Claim. <br /> 2. The dates of all facts related to the Contract Claim. I <br /> 3. The name of each Owner's individual, official, or employee involved in or knowledgeable about the <br /> Contract Claim. <br /> 4. The specific provisions of the Contract that support the Contract Claim and a statement of the reasons <br /> why such provisions support the Contract Claim. <br /> 5. If the Contract Claim relates to a decision of the Owner's Representative that the Contract leaves to <br /> the Owner's Representative's discretion or as to which the Contract provides that the Owner <br /> Representative's decision is final,the Contractor shall set out in detail all facts supporting its position <br /> relating to the decision of the Owner's Representative. <br /> 6. Identification of any documents and the substance of any oral communications that support the <br /> Contract Claim. <br /> 7. Copies of any identified documents that support the Contract Claim, other than Owner documents and <br /> documents previously furnished to the Owner by the Contractor. Standard industry manuals may be <br /> incorporated by reference. <br /> 8. If Contractor seeks an extension of Contract Time: <br /> a. The specific amount of time(including days and dates)sought. <br /> b. The specific reasons the Contractor believes an extension of Contract Time should be granted, <br /> including, but not limited to, compliance with the requirements of 5.2.C. Extensions of <br /> Contract Time;and <br /> c. The specific provisions of the Contract Documents under which it is sought. <br /> 9. If additional compensation is sought, the exact amount sought and a breakdown of that amount into <br /> the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a Contract Claim is <br /> made or in the absence of actual cost, the rates established by the AGC/WSDOT Equipment <br /> Rental Agreement that was in effect when the work was performed. In no case shall the amounts <br /> sought or paid for each piece of equipment exceed the rates established by the Equipment Rental <br /> Agreement even if the actual cost for such equipment is higher. The Owner may audit the <br /> Contractor's cost records to determine actual equipment cost. The following information shall <br /> be provided for each piece of equipment: <br /> 1) Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", Tractor <br /> Crawler ROPS&Dozer Included Diesel) <br /> 2) The hours of use or standby; and <br /> 3) The specific day and dates of use or standby; <br /> 4) Job Overhead. <br /> 5) Overhead(general and administrative). <br /> 6) Subcontractor's contract claims (in the same level of detail as specified herein is required <br /> for all Subcontractor's contract claims); and <br /> 10023829 City of Everett Public Works July 2018 111 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-50 Issue for Bid I <br />
The URL can be used to link to this page
Your browser does not support the video tag.