My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 7) Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the following <br /> language: <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of Contract Time, if <br /> any,made herein for Work on this Contract is a true and complete statement of the factual basis of <br /> the Contract Claim and all actual costs incurred and time sought, and is fully documented and <br /> supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> C. FALSE OR OMITTED INFORMATION <br /> A. General <br /> 1. The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br /> the exercise of reasonable care should know, is false, or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br /> ' and expenses incurred in investigating any such Contract Claim. <br /> D. REMEDIES <br /> A_ General <br /> 1. If a Contract Claim has merit in whole or in part, then Contractor's sole remedies shall be those <br /> provided in this subsection. <br /> a. Contractor must timely and strictly comply with the requirements of ARTICLE 10. NOTICE <br /> TO OWNER, ARTICLE 12. CONTRACT CLAIMS and all other General Conditions <br /> relating to the Contract Claim. <br /> b. Adjustments to Contract Time shall be determined pursuant to 5.2.C. Extensions of Contract <br /> Time. <br /> 2. Failure to comply strictly and timely shall be deemed a waiver of the Contract Claim. <br /> B. Extra Work <br /> 1. Adjustment of Contract Sum <br /> a. If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the <br /> adjustment shall be calculated and paid as provided in 9.5. Adjustment Of Contract Sum. <br /> 1) This amount includes jobsite and home office Overheads for such Work, including any <br /> schedule delays relating to such Work. <br /> 2) No compensation in addition to that provided in 9.7. Force Account shall be paid for <br /> such thing as extended Overhead or other costs or damages. <br /> b. Extension of Contract Time <br /> 1) Extensions of Contract Time caused by Extra Work shall be determined as provided in <br /> 5.2.C. Extensions of Contract Time. <br /> C. Delays <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-51 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.