My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 30 00 <br /> SPECIAL CONDITIONS <br /> PART 1 - GENERAL <br /> ' 1.1 SUMMARY <br /> A. Section Includes: <br /> ' 1. Administrative and procedural requirements for: <br /> a. Preconstruction Conference. <br /> b. Project signs. <br /> c. Contractor's Superintendent's Field Office. <br /> d. Engineer's Field Office. <br /> e. Drawings and Contract Documents for Contractor use. <br /> f. Project photographs. <br /> g. Testing and Special Inspections. <br /> h. Schedule of Values. <br /> i. Project meetings. <br /> j. Special considerations related to adjacent properties and facilities. <br /> k. Historical and archaeological finds. <br /> 1. Administrative procedures. <br /> B. Related Specification Sections include but are not necessarily limited to: <br /> ' 1. Division 00-Procurement and Contracting Requirements. <br /> 2. Division 01 -General Requirements. <br /> 1.2 QUALITY ASSURANCE <br /> A. Referenced Standards: <br /> 1. Building code: <br /> a. International Code Council(ICC): <br /> 1) International Building Code and associated standards,2015 Edition including all <br /> amendments,referred to herein as Building Code. <br /> 1.3 SUBMITTALS <br /> A. Shop Drawings: <br /> 1. See Specification Section 01 33 00 for requirements for the mechanics and administration of <br /> the submittal process. <br /> ' 2. Project Sign Layout and mounting design. <br /> 1.4 PRECONSTRUCTION CONFERENCE <br /> ' A. A preconstruction conference shall be held at the City of Everett Water Pollution Control <br /> Facility(WPCF)after award of Contract. <br /> 1. Engineer will notify the Contractor as to the date and time of the conference two(2)weeks <br /> in advance of the proposed date. <br /> ' 2. Contractor's Project Manager and Project Superintendent and Contractor's Subcontractor <br /> Representatives shall attend. <br /> 1.5 PROJECT SIGNS <br /> ' A. Within 10 days after receipt of Notice to Proceed,furnish, install, and maintain a Project Sign as <br /> defined herein. No other signs will be allowed on the project unless approved in writing by the <br /> Owner. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> SPECIAL CONDITIONS <br /> 01 30 00- 1 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.