My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. Certificate of Insurance and additional insured endorsement, Document 00 72 13, Part 15.3 <br /> "Insurance", of the Contract Documents. <br /> E. A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1.25 TIME OF COMPLETION <br /> A. The Contractor shall complete the Work on or before the date or dates specified in Document 00 60 13 - <br /> IIContract. <br /> 1.26 WAGES <br /> A. This Contract is subject to the minimum wage requirements of RCW 39.12 and to RCW 48.28, as <br /> amended or supplemented. Workers shall receive no less than the prevailing rate of wage. Bidder shall <br /> use the Washington State Prevailing Wage Rates for Snohomish County, effective at the time of bid <br /> opening. Bidder is solely responsible to use the schedule in effect at the Bid Opening Date,determine the <br /> appropriate labor classification(s),and use the appropriate and correct prevailing wage and benefit rate(s). <br /> 1 1. Current RCW 39.12 prevailing wage rates and fringe benefits can be found on line at <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp. <br /> a. City will mail a hard copy of the applicable wage rates upon request to the Bidder. <br /> 2. The rules and regulations noted within the Contract Documents are available from: <br /> ' State of Washington Department of Labor and Industries City <br /> Employment.Standards Division <br /> General Administration Building <br /> Olympia,Washington 98504 <br /> Contact: Janet Day <br /> (206)753-6317 <br /> B. Bidders are advised to examine and to be thoroughly familiar with such requirements. <br /> 1. No claim for additional compensation will be allowed that is based upon a lack of knowledge of <br /> these requirements or a failure to include adequate increases in such wages over the term of this <br /> Contract in the Bidder's bid price. <br /> 1 1.27 EQUAL EMPLOYMENT OPPORTUNITY <br /> A. The Contractor will be required to assure that equal employment opportunities will be in effect to all <br /> individuals throughout the length of this Contract, pursuant to Document 00 72 13, Part 7 "Labor <br /> Standards," of the Contract Documents. <br /> B. The Contractor must comply with all local, state and federal laws pertaining to non-discrimination and <br /> equal employment opportunity. <br /> 1.28 DBE/WBE SUBCONTRACTOR REQUIREMENTS <br /> A. The Contractor is required to actively solicit bids for subcontract work from "Disadvantaged Business <br /> Enterprises"(DBE's)and"Women's Business Enterprises"(WBE's). <br /> 1 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> INSTRUCTIONS TO BIDDERS <br /> 00 21 13-9 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.