My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3632-18
>
Ordinances
>
Ordinance 3632-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 11:29:59 AM
Creation date
11/15/2018 11:29:55 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3632-18
Date
11/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4 Effective January 1, 2022: <br /> Section 4.1: Water and Sewer System Development Charges <br /> Water System Sewer System Total Water and Sewer <br /> Development Development System Development <br /> Meter Size Charge Charge Charges <br /> $4,311 $5,580 $9,891 <br /> 1" <br /> domestic/fire* $4,311 $5,580 $9,891 <br /> 1" $7,200 $9,318 $16,518 <br /> 1'/" $14,357 $18,580 $32,937 <br /> 2" $22,979 $29,739 $52,719 <br /> 3" $43,113 $55,796 $98,909 <br /> 4" $71,870 $93,011 $164,881 <br /> 6" $143,697 $185,967 $329,664 <br /> 8" $229,924 $297,559 $527,482 <br /> 10" $330,550 $427,786 $758,336 <br /> 12" $485,026 $627,702 $1,112,728 <br /> *Domestic/Fire combination meter for Single Family Residences and Duplexes <br /> reviewed under the International Residential Code, upsized due to the addition of a <br /> fire sprinkler system <br /> The above table contains charges for inside City limits. Areas outside City limits, <br /> but connected to the City's water and sewer system, shall be charged the inside- <br /> City-limits charge plus a 25% surcharge. <br /> Section 4.2: Stormwater System Development Charge. In addition to water and sewer <br /> system development charges, there shall be a stormwater system development charge <br /> based on square footage of impervious area*: <br /> Development Type Stormwater System Development Charge <br /> New Construction Base Charge(1 ISU<_2500 sf):$678 <br /> Additional charge for impervious area>2500 sf: $0.2678/sf <br /> Existing <br /> Development adding Calculated per square foot of added impervious surface area at <br /> new impervious $0.2678/sf <br /> surface area <br /> ISU=Impervious Surface Unit,defined as 2500 sf of impervious surface area. <br /> * Impervious Area as defined in the Washington State Stormwater Management Manual for <br /> Western Washington <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.