My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 <br /> 2 <br /> I3 1-08 PROSECUTION AND PROGRESS <br /> 4 <br /> 5 Add the following new section: <br /> I6 <br /> 7 1-08.0 Preliminary Matters <br /> 8 (May 25, 2006 APWA GSP) <br /> 1 <br /> 10 Add the following new section: <br /> I11 <br /> 12 1-08.0(1) Preconstruction Conference <br /> I13 (October 10, 2008 APWA GSP) <br /> 14 <br /> 15 Prior to the Contractor beginning the work, a preconstruction conference will be held <br /> I16 between the Contractor, the Engineer and such other interested parties as may be invited. <br /> 17 The purpose of the preconstruction conference will be: <br /> 18 1. To review the initial progress schedule; <br /> I19 2. To establish a working understanding among the various parties associated or affected <br /> 20 by the work; <br /> 21 3. To establish and review procedures for progress payment, notifications, approvals, <br /> I22 submittals, etc. <br /> 23 4. To establish normal working hours for the work; <br /> 24 5. To review safety standards and traffic control; and <br /> I25 6. To discuss such other related items as may be pertinent to the work. <br /> 26 <br /> 27 The Contractor shall prepare and submit at the preconstruction conference the following: <br /> I28 1. A breakdown of all lump sum items; <br /> 29 2. A preliminary schedule of working drawing submittals; and <br /> 30 3. A list of material sources for approval if applicable. <br /> 31 <br /> 32 (******) <br /> 33 4. Project Labor List-Weighted Wage Rates for Force Account work. <br /> 1 34 5. Project Equipment List that includes information as set forth in Equipment Watch. <br /> 35 6. 24-hour Phone Contact List of individuals responsible for responding to issues outside of <br /> 36 working hours, including evenings, weekends and holidays. <br /> I37 <br /> 38 <br /> 39 Add the following new section: <br /> I40 <br /> 41 1-08.0(2) Hours of Work <br /> 42 (December 8, 2014 APWA GSP) <br /> I43 <br /> 44 Except in the case of emergency or unless otherwise approved by the Engineer, the normal <br /> 45 working hours for the Contract shall be any consecutive 8-hour period between 7:00 a.m. <br /> I 46 and 6:00 p.m. Monday through Friday, exclusive of a lunch break. If the Contractor desires <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 60 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />