My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 different than the normal working hours stated above, the request must be submitted in I <br /> 2 writing prior to the preconstruction conference, subject to the provisions below. The working <br /> 3 hours for the Contract shall be established at or prior to the preconstruction conference. I <br /> 4 <br /> 5 All working hours and days are also subject to local permit and ordinance conditions (such as <br /> 6 noise ordinances). I <br /> 7 <br /> 8 If the Contractor wishes to deviate from the established working hours, the Contractor shall <br /> 9 submit a written request to the Engineer for consideration. This request shall state what <br /> 10 hours are being requested, and why. Requests shall be submitted for review no later than <br /> 11 $$12:00 noon on the working day $$ prior to the day(s) the Contractor is requesting to <br /> 12 change the hours. <br /> 13 <br /> 14 If the Contracting Agency approves such a deviation, such approval may be subject to <br /> 15 certain other conditions, which will be detailed in writing. For example: <br /> 16 <br /> 17 1. On non-Federal aid projects, requiring the Contractor to reimburse the Contracting <br /> 18 Agency for the costs in excess of straight-time costs for Contracting Agency <br /> II <br /> 19 representatives who worked during such times. (The Engineer may require <br /> 20 designated representatives to be present during the work. Representatives who may <br /> 21 be deemed necessary by the Engineer include, but are not limited to: survey crews; <br /> 22 personnel from the Contracting Agency's material testing lab; inspectors; and other <br /> 23 Contracting Agency employees or third party consultants when, in the opinion of the <br /> 24 Engineer, such work necessitates their presence.) <br /> 25 2. Considering the work performed on Saturdays, Sundays, and holidays as working <br /> 26 days with regard to the contract time. <br /> 27 3. Considering multiple work shifts as multiple working days with respect to contract I <br /> 28 time even though the multiple shifts occur in a single 24-hour period. <br /> 29 4. If a 4-10 work schedule is requested and approved the non working day for the week <br /> 30 will be charged as a working day. <br /> 31 5. If Davis Bacon wage rates apply to this Contract, all requirements must be met and <br /> 32 recorded properly on certified payroll I 33 <br /> 34 1-08.1 Subcontracting <br /> 35 <br /> 36 Section 1-08.1 is supplemented with the following: <br /> 37 <br /> 38 (October 12, 1998 WSDOT GSP) <br /> 39 Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor shall11 <br /> 40 submit to the Engineer a certification (WSDOT Form 420-004 EF) that a written agreement <br /> 41 between the Contractor and the subcontractor or between the subcontractor and any lower <br /> 42 tier subcontractor has been executed. This certification shall also guarantee that these <br /> 43 subcontract agreements include all the documents required by the Special Provision Federal <br /> 44 Agency Inspection. <br /> 45I <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 61 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.