My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 A Subcontractor or lower tier Subcontractor will not be permitted to perform any work under <br /> 2 the contract until the following documents have been completed and submitted to the <br /> I 3 Engineer: <br /> 4 <br /> 5 1. Request to Sublet Work (Form 421-012 EF), and <br /> I 6 7 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br /> Federal-aid Projects (Form 420-004 EF). <br /> 8 <br /> 9 The Contractor's recordspertaining to the requirements of this Special Provision shall be <br /> I 10 open to inspection or audit by representatives of the Contracting Agency during the life of the <br /> 11 contract and for a period of not less than three years after the date of acceptance of the <br /> 12 contract. The Contractor shall retain these records for that period. The Contractor shall also <br /> I13 guarantee that these records of all Subcontractors and lower tier Subcontractors shall be <br /> 14 available and open to similar inspection or audit for the same time period. <br /> 15 <br /> I16 <br /> 17 <br /> 18 1-08.3 Progress Schedule <br /> I19 <br /> 20 <br /> 21 1-08.3(2)B Type B Progress Schedule <br /> I22 (March 13, 2012 APWA GSP) <br /> 23 <br /> 24 Revise the first paragraph to read: <br /> 25 <br /> 26 <br /> 27 The Contractor shall submit a preliminary Type B Progress Schedule at or prior to the <br /> I28 preconstruction conference. The preliminary Type B Progress Schedule shall comply with <br /> 29 all of these requirements and the requirements of Section 1-08.3(1), except that it may be <br /> 30 limited to only those activities occurring within the first 60-working days of the project. <br /> 31 <br /> I32 Revise the first sentence of the second paragraph to read: <br /> 33 <br /> 34 The Contractor shall submit 5 copies of a Type B Progress Schedule depicting the <br /> I35 entire project no later than 21-calendar days after the preconstruction conference. <br /> 36 <br /> 37 <br /> I38 <br /> 39 1-08.4 Prosecution of Work <br /> 40 <br /> I41 Delete this section and replace it with the following: <br /> 42 <br /> 43 1-08.4 Notice to Proceed and Prosecution of Work <br /> I44 (July 23, 2015 APWA GSP) <br /> 45 <br /> 46 Notice to Proceed will be given after the contract has been executed and the contract bond <br /> I47 and evidence of insurance have been approved and filed by the Contracting Agency. The <br /> 48 Contractor shall not commence with the work until the Notice to Proceed has been given by <br /> 49 the Engineer. The Contractor shall commence construction activities on the project site <br /> 1 50 within ten days of the Notice to Proceed Date, unless otherwise approved in writing. The <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 62 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.