Laserfiche WebLink
1 <br /> 1 Materials Laboratory, or *** 30 *** calendar days after execution by the Contracting Agency, <br /> 2 whichever occurs first. <br /> 3 <br /> 4 No additional Procurement Suspension will be provided if the Contractor's HMA mix designs <br /> 5 did not meet Contract requirements and are resubmitted. <br /> 6 <br /> 7 <br /> 8 1-08.9 Liquidated Damages <br /> 9 (August 14, 2013 APWA GSP) <br /> 10 <br /> 11 Revise the fourth paragraph to read: <br /> 12 <br /> 13 When the Contract Work has progressed to Substantial Completion as defined in the <br /> 14 Contract, the Engineer may determine that the work is Substantially Complete. The <br /> 15 Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br /> 16 overruns in Contract time occurring after the date so established, the formula for liquidated <br /> 17 damages shown above will not apply. For overruns in Contract time occurring after the <br /> 18 Substantial Completion Date, liquidated damages shall be assessed on the basis of direct <br /> 19 engineering and related costs assignable to the project until the actual Physical Completion <br /> 20 Date of all the Contract Work. The Contractor shall complete the remaining Work as <br /> 21 promptly as possible. Upon request by the Project Engineer, the Contractor shall furnish a <br /> 22 written schedule for completing the physical Work on the Contract. <br /> 23 <br /> 24 <br /> 25 1-09 MEASUREMENT AND PAYMENT <br /> 26 <br /> 27 <br /> 28 1-09.2(1) General Requirements for Weighing Equipment <br /> 29 (July 23, 2015 APWA GSP, Option 2) <br /> 30 <br /> 31 Revise item 4 of the fifth paragraph to read: <br /> 32 <br /> 33 4. Test results and scale weight records for each day's hauling operations are provided to <br /> 34 the Engineer daily. Reporting shall utilize WSDOT form 422-027, Scaleman's Daily <br /> 35 Report, unless the printed ticket contains the same information that is on the Scaleman's <br /> 36 Daily Report Form. The scale operator must provide AM and/or PM tare weights for <br /> 37 each truck on the printed ticket. <br /> 38 <br /> 39 <br /> 40 1-09.2(5) Measurement <br /> 41 (May 2, 2017 APWA GSP) <br /> 42 <br /> 43 Revise the first paragraph to read: <br /> 44 <br /> 45 Scale Verification Checks — At the Engineer's discretion, the Engineer may perform <br /> 46 verification checks on the accuracy of each batch, hopper, or platform scale used in weighing <br /> 47 contract items of Work. <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 65 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />