KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 <br /> 2 <br /> I 3 1-09.6 Force Account <br /> 4 (October 10, 2008 AP'v"✓A GSP) <br /> 5 <br /> I6 Supplement this section with the following: <br /> 7 <br /> 8 The Contracting Agency has estimated and included in the Proposal, dollar amounts for all <br /> 9 items to be paid per force account, only to provide a common proposal for Bidders. All such <br /> I10 dollar amounts are to become a part of Contractor's total bid. However, the Contracting <br /> 11 Agency does not warrant expressly or by implication, that the actual amount of work will <br /> 12 correspond with those estimates. Payment will be made on the basis of the amount of work <br /> I13 actually authorized by Engineer. <br /> 14 <br /> 15 <br /> I16 1-09.8 Payment For Material On Hand <br /> 17 <br /> 18 The last paragraph of Section 1-09.8 is revised to read: <br /> 19 <br /> 20 (August 3, 2009 WSDOT GSP) <br /> 21 The Contracting Agency will not pay for material on hand when the invoice cost is less than <br /> 22 $2,000. As materials are used in the work, credits equaling the partial payments for them will <br /> 23 be taken on future estimates. Each month, no later than the estimate due date, the <br /> 24 Contractor shall submit a letter to the Engineer that clearly states: 1) the amount originally <br /> I25 paid on the invoice (or other record of production cost) for the items on hand, 2) the dollar <br /> 26 amount of the material incorporated into each of the various work items for the month, and <br /> 27 3) the amount that should be retained in material on hand items. If work is performed on the <br /> 28 items and the Contractor does not submit a letter, all of the previous material on hand <br /> I29 payment will be deducted on the estimate. Partial payment for materials on hand shall not <br /> 30 constitute acceptance. Any material will be rejected if found to be faulty even if partial <br /> 31 payment for it has been made. <br /> I32 <br /> 33 <br /> 34 1-09.9 Payments <br /> I35 <br /> 36 (March 13, 2012 APWA GSP) <br /> 37 <br /> I38 Supplement this section with the following: <br /> 39 <br /> 40 Lump sum item breakdowns are not required when the bid price for the lump sum item is <br /> I41 less than $20,000. <br /> 42 <br /> 43 <br /> 44 <br /> I45 (March 13, 2012 APWA GSP) <br /> 46 <br /> 47 Delete the first four paragraphs and replace them with the following: <br /> I48 <br /> 49 The basis of payment will be the actual quantities of Work performed according to the <br /> I 50 Contract and as specified for payment. <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 66 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> r <br />