My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 2. A detour provided in the Plans or approved by the Engineer for by-passing all or <br /> 2 any portion of the construction, irrespective of whether or not the termini of the <br /> I 3 4 detour are within the limits of the Contract. The provisions of Section 1-04.6 will <br /> not apply to any traffic control or traffic control items. The measurement and <br /> 5 payment for the items included in the Bid Proposal for traffic control costs incurred <br /> I 6 7 within the limits of 1 and 2 above will be made to the Contractor by the <br /> Contracting Agency as described in these Special Provisions. <br /> 8 <br /> 9 "Uniformed Police Officer" (UPO) will be measured by the hour for each officer used to <br /> 10 facilitate construction TCC activities. A Uniformed Police Officers will be required, unless <br /> 11 temporary traffic lights are installed at each end, when there is a shared single lane of <br /> 12 north and southbound traffic. Other project specific conditions such as full closures may <br /> I13 also require the use of a UPO. Plans for submittal and review shall include durations, <br /> 14 of the UPO efforts in order to qualify for payment. <br /> 15 <br /> 16 1-10.5 Payment <br /> 17 <br /> 18 1-10.5(2) Item Bids with Lump Sum for incidentals <br /> I19 <br /> 20 Section 1-10.5(2.) is supplemented with the following: <br /> 21 <br /> I22 (******) <br /> 23 "Uniformed Police Officer", per hour. <br /> 24 The unit contract price, when applied to the number of units measured for this item in <br /> I25 accordance with Section 1-10.4(2), shall be full compensation for all labor costs incurred <br /> 26 by the Contractor in performing the Work specified for this item in Section 1-10.4(2). <br /> 27 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> IWEST MARINE VIEW DRIVE UTILITIES PAGE 72 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.