KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 All excavation and backfill outside the trench neat lines shown in the drawings associated <br /> 2 with the installation or removal of the shoring system shall be considered incidental to <br /> 3 "Shoring or Extra Excavation Class B" , <br /> 4 <br /> 5 <br /> 6 There will be no separate payment for the costs associated with removal and disposal of <br /> 7 obstructions located fully within the defined limits of Excavation (Section 2-09.4). Removal <br /> 8 of obstructions that extend beyond the defined limits of Excavation (Section 2-09.4), if <br /> 9 approved by the Engineer, will be paid for as"Removal of Structures and Obstructions", force <br /> 10 account. <br /> 11 <br /> 12 <br /> 13 <br /> 14 2-11 TRIMMING AND CLEANUP <br /> 15 <br /> 16 2-11.1 Description <br /> 17 Section 2-11.1 is supplemented with the following: <br /> 18 <br /> 19 (February 17, 1998 City of Everett GSP) <br /> 20 During the process of construction, the Contractor shall keep the project site in a neat, orderly <br /> 21 condition with as little disruption to the adjoining properties as practical under the conditions. <br /> 22 <br /> 23 2-11.3 Construction Requirements <br /> 24 Section 2-11.3 is supplemented with the following: <br /> 25 <br /> 26 (*** **) <br /> 27 The Contractor shall keep City streets clean and free from mud, dirt or other debris. <br /> 28 <br /> 29 When the streets are dirtied due to construction activity, the Contractor shall clean the streets <br /> 30 at the conclusion of each work day and on other occasions as needed. The cleaning device <br /> 31 shall be approved by the Engineer. Flushing streets into storm drainage collection shall not <br /> 32 be permitted. <br /> 33 <br /> 34 Should the Contractor <br /> OntraCiOr nGt clean the streets as required, ♦he City may elect to clean the streets <br /> 35 themselves or procure the services of a street cleaner. In this event, all costs for the street <br /> 36 cleaning will be charged to the Contractor. <br /> 37 <br /> 38 Drainage facilities such as inlets, catch basins, culverts and open ditches shall be cleaned of <br /> 39 all debris which is the result of the Contractor's operations. <br /> 40 <br /> 41 The Contractor shall remove and dispose of all construction stakes. <br /> 42 <br /> 43 Upon completion of the project, the project shall be cleaned and slopes neatly dressed to <br /> 44 present a uniform appearance blending into the contour of adjacent properties. Trash of all <br /> 45 kinds resulting from construction operations shall be removed. <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 83 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> 1 <br />