Laserfiche WebLink
I <br /> 111 1 2-07.8(4) Payment <br /> 2 Payment will be made in accordance with Section 1-04.1 for the following bid item: <br /> 34 "Street Cleaning", per hour. <br /> 5 <br /> I6 <br /> 7 2-09 STRUCTURE EXCAVATION <br /> 8 <br /> I9 <br /> 10 2-09.3 Construction Requirements <br /> 11 <br /> I12 The fourth paragraph of Section 2-09.3(1)E is replaced with the following: <br /> 13 <br /> 14 Controlled Density Fill (CDF) or Controlled Low-Strength Material (CLSM) — CDF is a <br /> I15 self compacting, cementitious, flowable material requiring no subsequent vibration or <br /> 16 tamping to achieve consolidation. The Contractor shall provide a mix design in writing to the <br /> 17 Engineer on WSDOT Form 350-040 and utilize ACI 229 as a guide to develop the CDF mix <br /> 18 design. No CDF shall be placed until the Engineer has reviewed the mix design. CDF shall <br /> I19 be designed to have a minimum 28-day strength of 50 psi and a maximum 28-day strength <br /> 20 not to exceed 150 psi. The CDF consistency shall be flowable (approximate slump 3 to 10 <br /> 21 inches). <br /> I22 <br /> 23 <br /> 24 2-09.4 Measurement <br /> I25 The third paragraph of Section 2-09.4 is replaced with the following: <br /> 26 <br /> 27 <br /> l 1 <br /> I28 For all pipes, pipe arches, structural plate pipes, and underpasses, the Structure excavation <br /> 29 quantity will be calculated based on the dimensions called out in the Drawings. Neat line <br /> 30 calculations shall be based on the dimensions shown in the applicable trench sections in <br /> I31 Drawing C4.3. <br /> 32 <br /> 33 <br /> I34 The last paragraph of Section 2-09.4 is replaced with the following: <br /> 35 <br /> 36 (#.*****) <br /> 37 Controlled density fill will be measured according to Section 7-08.4 of these Special <br /> I38 Provisions. <br /> 39 <br /> 40 Payment <br /> I41 The last paragraph of Section 2-09.5 is replaced with the following: <br /> 42 <br /> 43 (******) <br /> I44 Controlled density fill will be paid for according to Section 7-08.5 of these Special Provisions. <br /> 45 <br /> 46 Section 2-09.5 is supplemented with the following: <br /> 1 47 <br /> 48 (******) <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 82 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />