My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 1 2-07.8(4) Payment <br /> 2 Payment will be made in accordance with Section 1-04.1 for the following bid item: <br /> 34 "Street Cleaning", per hour. <br /> 5 <br /> I6 <br /> 7 2-09 STRUCTURE EXCAVATION <br /> 8 <br /> I9 <br /> 10 2-09.3 Construction Requirements <br /> 11 <br /> I12 The fourth paragraph of Section 2-09.3(1)E is replaced with the following: <br /> 13 <br /> 14 Controlled Density Fill (CDF) or Controlled Low-Strength Material (CLSM) — CDF is a <br /> I15 self compacting, cementitious, flowable material requiring no subsequent vibration or <br /> 16 tamping to achieve consolidation. The Contractor shall provide a mix design in writing to the <br /> 17 Engineer on WSDOT Form 350-040 and utilize ACI 229 as a guide to develop the CDF mix <br /> 18 design. No CDF shall be placed until the Engineer has reviewed the mix design. CDF shall <br /> I19 be designed to have a minimum 28-day strength of 50 psi and a maximum 28-day strength <br /> 20 not to exceed 150 psi. The CDF consistency shall be flowable (approximate slump 3 to 10 <br /> 21 inches). <br /> I22 <br /> 23 <br /> 24 2-09.4 Measurement <br /> I25 The third paragraph of Section 2-09.4 is replaced with the following: <br /> 26 <br /> 27 <br /> l 1 <br /> I28 For all pipes, pipe arches, structural plate pipes, and underpasses, the Structure excavation <br /> 29 quantity will be calculated based on the dimensions called out in the Drawings. Neat line <br /> 30 calculations shall be based on the dimensions shown in the applicable trench sections in <br /> I31 Drawing C4.3. <br /> 32 <br /> 33 <br /> I34 The last paragraph of Section 2-09.4 is replaced with the following: <br /> 35 <br /> 36 (#.*****) <br /> 37 Controlled density fill will be measured according to Section 7-08.4 of these Special <br /> I38 Provisions. <br /> 39 <br /> 40 Payment <br /> I41 The last paragraph of Section 2-09.5 is replaced with the following: <br /> 42 <br /> 43 (******) <br /> I44 Controlled density fill will be paid for according to Section 7-08.5 of these Special Provisions. <br /> 45 <br /> 46 Section 2-09.5 is supplemented with the following: <br /> 1 47 <br /> 48 (******) <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 82 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.